PF300-150 Calmer 

is an integral component to “best practice” 

rainwater collection ensuring that incoming rainwater to the 
tank is calmed, ensuring sediment stirring is kept at a minimum 

 
 
 
 
PR-RSDS-150-200 back-flushing nozzle 

for PR-150-S and 

PR-150-S o.SK 
 
For large filters, we recommend the back-flushing nozzles to 
minimize  the  intervals  of  manual  maintenance.  The  back-
flushing nozzle is installed in PURAIN rainwater filters behind 
the  sieve.  The  mounting  components  required  for  this  are 
included.  The  water  required  for  back-flushing  can either  be 
supplied manually  through a tap or automatically via a time-
controlled solenoid valve. 
 
 

PR-RSDS-150-200 back-flushing nozzle 

for PR-150-M 

 
PR150-M  without  baffle  means  there  is  no  anchoring  point  to  connect  the  back-flush  nozzle. 
Therefore, it is recommended to drill a hole in the side of the filter as shown and adapt the sprayer 
connection arm angle and fix to this position 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
**See  separate  PR  RSDS-150-200  back  flush  Installation  Manual  available  from  your  country 
distributor 
 

Accessories Codes 

 

Description 

Part No. 

Code 

Cover for PR-150-S (all models) 

210148 

PR-150-C 

PLURAFIT chamber extension 

300005 

PF 300-S 

PLURAFIT cap 

300010 

PF 300-C 

Back-flushing nozzle for PR-150-S (all models) 

210170 

PR-RSDS-150-200 

 
 
 

Содержание PR150-M

Страница 1: ...0 PURAIN 150 S versions Hydraulic jump rainwater filter German engineering High efficiency self cleaning patented Instruction and Installation Guide www intewa de...

Страница 2: ...PR150 S for standard in tank cistern installation incl skimmers 210143 PR150 S oSK for out of tank or in ground installation has no skimmers 210149 PR150 M for monsoon high flow use For in tank ciste...

Страница 3: ...ld rainfall is termed light events measured as less than 6mm in 5 minutes 3 of world rainfall is termed heavy events measured as more than 6mm in 5 minutes As most other filters cannot adequately coll...

Страница 4: ...ulic jump design self cleaning feature Minimal maintenance required Generally only one filter needed for each building project even if multiple tanks are used 0 8mm removable stainless steel filter st...

Страница 5: ...flushing can either be supplied manually through a tap or automatically via a time controlled solenoid valve PR RSDS 150 200 back flushing nozzle for PR 150 M PR150 M without baffle means there is no...

Страница 6: ...300 l s ha and a slope of 1 5 The discharge coefficient indicates by what factor the amount of rain discharged may be reduced due to the type of roof used considering water fall velocity evaporation...

Страница 7: ...roper skimming of the surface water the PR 150 S must be installed without any lateral tilt filter sides must be level A separate tank overflow does not need to be installed even if multiple tanks are...

Страница 8: ...chamber NOTE This kind of installation requires a PR 150 S o SK version filter because it comes without skimmer unnecessary outside of the tank NOTE Take into consideration the overflow pipe levels t...

Страница 9: ...t and leaves found in the discharge area need not be removed because they will be flushed out through the overflow with the next heavy rainfall If water has accumulated in the discharge area then the...

Страница 10: ...e of the products due to faulty or poor installation Any changes to design modification or addition of non specified parts will void this warranty Always retain your purchase invoice during the warran...

Страница 11: ...10 INTEWA GmbH Version 0 3rsa Subject to technical changes...