Intewa AQUALOOP greywater recycling 1200 L/day Скачать руководство пользователя страница 4

 
 

 
 

 

  

3

 

 

 

1.1

 

Pre

filter

  

 

The

 

pre

filter

 

should

 

be

 

checked

 

every

 

3

 

months

 

and

 

cleaned

 

every

 

6

 

months

 

if

 

necessary.

 

The

 

cleaning

 

interval

 

can

 

then

 

be

 

extended

 

depending

 

on

 

the

 

build

up

 

of

 

contaminants.

 

The

 

integrated

 

non

return

 

valve

 

must

 

be

 

checked

 

twice

 

a

 

year

 

and

 

cleaned

 

of

 

any

 

dirt

 

or

 

deposits.

 

Newer

 

Aqualoop

 

versions

 

are

 

being

 

installed

 

with

 

solenoid

 

activated

 

auto

back

flush

 

kits

 

attached

 

to

 

the

 

pre

filter.

 

This

 

means

 

that

 

maintenance

 

is

 

reduced

 

but

 

the

 

pre

filter

 

should

 

still

 

be

 

checked

 

regularly

 

in

 

case

 

of

 

blockage.

 

 
 

1.2

 

Suction

 

and

 

backwash

 

pumpset

 

 

It

 

is

 

recommended

 

that

 

a

 

function

 

test

 

of

 

the

 

pumps

 

is

 

carried

 

out

 

every

 

six

 

months.

 

Each

 

pump

 

is

 

started

 

in

 

the

 

test

 

menu

 

4.

 

In

 

the

 

case

 

where

 

one

 

pump

 

should

 

fail,

 

the

 

complete

 

double

 

pump

 

unit

 

should

 

be

 

replaced.

  

It

 

is

 

suggested

 

that

 

the

 

filtration

 

and

 

backwash

 

pump

 

set

 

be

 

replaced

 

after

 

20,000

 

hrs

 

running

 

time.

 

 

 

 

Please

 

rerun

 

the

 

water

tightness

 

test

 

to

 

ensure

 

there

 

are

 

no

 

air

 

leaks

 

in

 

the

 

pipework

 

after

 

the

 

replacement

 

of

 

the

 

double

 

pump

 

unit

 

(s.

 

section

 

9.1).

 

 
 
 
 

1.3

 

Float

 

switch

 

 

It

 

is

 

recommended

 

that

 

a

 

function

 

test

 

of

 

each

 

float

 

switch

 

is

 

carried

 

out

 

every

 

six

 

months.

 

The

 

float

 

switch

 

is

 

tested

 

by

 

manually

 

inverting

 

it

 

into

 

the

 

two

 

switch

 

positions

 

(Empty=lower

 

position

 

/Full=upper

 

position)

 

while

 

the

 

display

 

is

 

checked.

  

 

                                                     

 

Fig.:

 

lower

 

position

 ‐

>Display

 

=

 

Br

min

 ‐ 

Fig.:

 

upper

 

position

 ‐

>

 

Br

min

 

+

 

 

 

It

 

is

 

vitally

 

important

 

that

 

the

 

Br

min

 

float

 

switch

 

was

 

set

 

originally

 

at

 

the

 

correct

 

depth

 

for

 

full

 

functioning

 

operation.

   

This

 

should

 

be

 

checked

 

during

 

maintenance

 

visits

 

AND

 

also

 

ensure

 

that

 

the

 

float

 

switch

 

cannot

 

become

 

tangled

 

in

 

other

 

hoses

 

within

 

the

 

bioreactor

 

OR

 

get

 

caught

 

up

 

on

 

the

 

side

 

of

 

the

 

bioreactor

 

wall.

 

This

 

will

 

cause

 

the

 

suction

 

pump

 

to

 

malfunction

 

and

 

possibly

 

burn

 

out.

 

 

Содержание AQUALOOP greywater recycling 1200 L/day

Страница 1: ...reywater recycling 300 L day AQUALOOP greywater recycling 600 L day AQUALOOP greywater recycling 900 L day AQUALOOP greywater recycling 1200 L day AQUALOOP greywater recycling 1500 L day AQUALOOP grey...

Страница 2: ...Pressure sensor 4 1 5 Blower 4 1 6 1 Mechanical cleaning of the membrane 5 1 6 2 Chemical cleaning 6 1 6 2 1 In situ cleaning in the bioreactor 6 1 6 2 2 Intensive cleaning in separate cleaning tank...

Страница 3: ...onding chapters Maintenance and or check interval Replacement interval Pre filter Check and clean every 3 months Filtration backwash pump Check every 6 months Replace after 20 000 hrs running time Flo...

Страница 4: ...d It is suggested that the filtration and backwash pump set be replaced after 20 000 hrs running time Please rerun the water tightness test to ensure there are no air leaks in the pipework after the r...

Страница 5: ...the menu overview every 6 months Menu 5 Status 2 Pressure sensor pumps P ADr Pressure sensor blower P ADg When the pressure sensor is not connected the pressure displays 1 200 bar 1 5 Blower AQUALOOP...

Страница 6: ...ich is included with the blowers 1 6 Membrane 1 6 1 Mechanical cleaning of the membrane It needs to be determined based on the amount of sludge present in the bottom of the bioreactor whether a full e...

Страница 7: ...e In Situ cleaning Intensive cleaning Cleaning time 2 hrs 12 24 hrs Cleaning result greywater application Depends on the initial state of the membrane up to 1 5 L min Independent of the initial state...

Страница 8: ...in1 BRmin1 Fig Cleaning connection during normal operation Fig Cleaning device with connected canister chem fluid Shut off valve V1 open Shut off valve V1 close Shut off valve V2 close Shut off valve...

Страница 9: ...tion s section 11 6 3 can be added through the cleaning connection In small tank systems with good accessibility e g AL GW200 the cleaning solution can be filled directly into the backwash tank Note T...

Страница 10: ...in the standard manner The goal is to circulate the cleaning solution under normal pressure and flow rate for 24 hours Therefore the start times T1 and T2 and filtration cycles have to be set as foll...

Страница 11: ...tion with integrated control unit 1 6 2 3 Cleaning solution We recommend the cleaning solution to be made from regular domestic cleaning agents and should be mixed as following example for In Situ cle...

Страница 12: ...d well with water after being cleaned with acid before cleaning with alkali and the other way around Follow the warning and safety instructions of the chemicals used Protective gloves and glasses are...

Страница 13: ...dissolved oxygen content should be 4 mg L with a range up to 8 mg L The AQUALOOP system treated outflow should be clear like tap water If the effluent is not clear please check the tightness of all me...

Страница 14: ...OP blower filter element for 30 100 120 Note 100 and 120 needs two elements ALBL FILTER A 600716 AQUALOOP blower filter element for 60 200 Note 200 needs two elements ALBL FILTER B 600717 AQUALOOP blo...

Страница 15: ...djusted Voltage 24 V DC Power 12 W 4 Warranty Contact The warranty terms are included in our sales conditions and can be viewed at http www intewa de en customer menu contact legal conditions For any...

Страница 16: ...direct or consequential damages including but not limited to lost profits lost income labour charges delays in production and or idle production which result from defects in material and or workmansh...

Страница 17: ...from notification Owner Requirements 1 AQUALOOP system owners must sign a service contract with a local dealer to conduct periodic checks and maintenance and comply with all requirements outlines in I...

Страница 18: ...y http www intewa de en company partners international distributors Distribution in South Africa is handled by Pure Rain Technologies Pty Ltd Cirtech House Westlake Business Park Cape Town Tel 086 111...

Страница 19: ...18 INTEWA GmbH Version v2 0 sa Subject to technical changes...

Отзывы: