www.intertec.info
Operating Instructions CP HORIZOTHERM DNNA
Page 6 / 8
HOM178902027Ien-5
INTERTEC-Hess GmbH · Raffineriestr. 8 · 93333 Neustadt/Donau · Germany ·
+49 9445 9532-0 · [email protected]
1
2
J
L
N
PE
J
J
J
Junction box
TAE
TS
Heater
Option AM
bn=brown bl=blue ye/gn=yellow/green bk=black gy=grey
bn
bl
ye/gn
bk
gy
Illustration 5:
CP ..THERM with TAE
1
2
J
L
N
PE
J
Terminal box
TS
Heating
Option: FA
br=brown bl=blue ye/gn=yellow/green bk=black gr=grey
br
bl
ye/gn
bk
gr
Illustration 6:
CP ..THERM with TS
9
Commissioning
If the heater is installed in accordance with the notes in
the
Page 5]
sections, then the radiator may be commis-
sioned.
CAUTION
Sufficient heat dissipation must be ensured.
Unauthorized covers must be removed as otherwise
there is the risk of the heater overheating.
The heating circuit is permanently disconnected by a
temperature melt fuse which can't be reset if these in-
stallation instructions are not adhered to.
10
Maintenance
The design of the device does not require any mainten-
ance.
Functional and safety test intervals can be freely selec-
ted by the operator in accordance with the applicable
regulations.