intermountain AC-12 Скачать руководство пользователя страница 13

 

Page 13 of 16

 

 

 

Figure 8 

 

Содержание AC-12

Страница 1: ...arts Tools required Small flat blade screw driver Small Phillips head screw driver Locomotive cradle holder Scotch Tape optional The gear box replacement is a multi part procedure that will require co...

Страница 2: ...e 1 Step 3 Loosen the grab irons from cab doors on each side of the locomotive cab Loosen the connecting grab iron from the back of the cab below the window See Figure 2 Step 4 Loosen the detail pipin...

Страница 3: ...Lift the weight out of the way being careful not to pull or jerk on the wiring See Figure 7 Step 10 Lift the motor out of the frame removing the drive shaft from the gear box end and setting the motor...

Страница 4: ...fully threading the pickup wires through the frame Once they are fitted back together screw in the four screws from the top and the one screw from the bottom See Figure 8 Step 18 Reinstall the motor a...

Страница 5: ...from the locomotive boiler Details will need to be reattached on each side See Figure 3 Step 24 Reattach the grab irons to the cab doors along witggh the connecting grab irons on the back of the cab...

Страница 6: ...Page 6 of 16 FIGURE 1...

Страница 7: ...Page 7 of 16 Figure 2...

Страница 8: ...Page 8 of 16 Figure 3...

Страница 9: ...Page 9 of 16 Figure 4...

Страница 10: ...Page 10 of 16 Figure 5...

Страница 11: ...Page 11 of 16 Figure 6...

Страница 12: ...Page 12 of 16 Figure 7...

Страница 13: ...Page 13 of 16 Figure 8...

Страница 14: ...Page 14 of 16 Figure 9...

Страница 15: ...Page 15 of 16 Figure 10...

Страница 16: ...Page 16 of 16 Figure 11...

Отзывы: