© 2019 United Technologies Corporation.
P/N 1073222-EN
• REV
C
• ISS
01FEB19
Interlogix is part of UTC Climate, Controls & Security, a unit of United Technologies Corporation.
All rights reserved. All trademarks are the
property of their respective owners. Information in this document is subject to change without notice.
NS3552
-16P-2T-
2S Quick Installation Guide
Figure 1: NS3552-16P-2T-2S Industrial L2+ Multi-port Full Gigabit
Managed Ethernet Switch
Package contents
Thank you for purchasing
the
NS3552
-16P-2T-
2S
IFS
L2+
industrial managed switch
. The descriptions
of th
is model are
as
follows
:
Industrial 16
-Port 10/100/1000T 802.3at PoE +
2-Port 10/100/100T
+ 2-
Port 100/1000X SFP Managed Switch
Unless specified, t
he term “
industrial managed switch
”
mentioned in this
quick installation guide
refers to the NS3552
-
16P-2T-
2S
.
Open the box of the industrial managed switch
and carefully
unpack it. The box should contain the following items:
The
industrial managed swi
tch × 1
Quick installation gu
ide × 1
CD with user manual × 1
DIN
rail kit × 1
Wall
mounting k
it × 1
DB9 to RJ45
i
nterface RS232
console c
able
× 1
Dust
cap (see
the table below)
RJ45 Dust Cap
SFP Dust Cap
NS3552
-16P-2T-
2S
19
2
If any of these are
missing or damaged,
contact your dealer
immediately. If possible, retain the carton including the original
packing materials
for
repacking
the product in case there is a
need to return it to us for repair.
Requirements
The
industrial managed switch
provide
s a
remote login
int
erface for
manage
ment purposes. The following equipment
is
necessary
for further management:
Workstation
is
installed with Ethernet NIC (Network
Interface Card)
Choice of Internet browsers includes
Windows
®
XP/2003,
Vista, Windows 7, Windows 8, Windows
10, MAC OS X,
Linux, Fedora, Ubuntu
,
or other platform
s
compatible with
TCP/IP protocols.
The a
bove w
orkstation has a
web
browser and JAVA
runtime environment
p
lug
-in installed.
Ethernet port connection
U
se standard network (UTP) cables with RJ45
connectors.
Note
: We recom
mend us
ing
Internet Explore
r 11.0 or later to
access the
industrial managed switch
.
Wiring the power inputs
The
upper panel of the industrial managed switch
indicates a
DC
inlet power socket
and consists
of one terminal block
connector within six
contacts. F
ollow
the steps
below to insert
the power wire
:
1.
Insert
the
positive/negative DC power wires into contacts 1
and 2 for Power
1
, or 5, and 6 for Power
2.
NS3552
-16P-2T-
2S : DC 48~56V
Figure 2: NS3552-16P upper panel
2. Ti
ghten the wire
-
clamp screws
to prevent the
wires from
loosening.