background image

Содержание GLZ6

Страница 1: ...April 1996 GLZ6 Setup and Maintenance Guide...

Страница 2: ...opyright Copyright 1995 Intergraph Corporation including this documentation and any software and its file formats and audio visual displays described herein all rights reserved may only be used pursua...

Страница 3: ...rallel blade and a grounding type attachment plug rated 15 A 125 V For units operating at 230 V domestic use Use a UL listed cord set consisting of a minimum 18 AWG type SVT or SJT three conductor cor...

Страница 4: ......

Страница 5: ...eplacing Boards in the Graphics Tower 10 Rasterization Accelerator and Frame Buffer 10 Expansion Adapter 12 Opening the Workstation Base Unit 13 Avoiding Electrostatic Discharge 15 Attaching an Antist...

Страница 6: ...vi Contents Returned Goods Authorization RGA Form Personal Workstation Warranty Procedure Repair Depot Address Labels...

Страница 7: ...the dialog boxes or the command line in lowercase unless directed otherwise SMALL CAPS Key names on the keyboard such as D ALT or F3 C Command line prompt indicating the character based interface to t...

Страница 8: ...used in accordance with the instruction manual it may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in wh...

Страница 9: ...one Support If you experience problems with your Intergraph system or software or have questions about the information in this document you can contact Intergraph for help In the United States call th...

Страница 10: ...x Preface...

Страница 11: ...s Unpacking the Equipment Since you are reading this document you have already opened the box and unpacked at least some of the graphics tower equipment Make sure you have the following items before c...

Страница 12: ...additional Rasterization Accelerator and Frame Buffer boards are installed in the graphics tower as shown by the dotted lines Workstation Graphics Base Unit Tower Rasterization Accelerator Board Fram...

Страница 13: ...ght Make sure the GLZ6 system has at least three inches of space in front and behind for proper air ventilation Never block the openings at the front or back of the GLZ6 system Avoid placing the GLZ6...

Страница 14: ...ng steps To connect the equipment 1 Install the footstands on the bottom of the graphics tower 2 Connect the Adapter cable to the adapter ports on the graphics tower and the workstation 3 Connect the...

Страница 15: ...on Setup and Maintenance Guide to power on the system Graphics Tower Workstation Base Unit AC Receptacle Video Port To Secondary Monitor Video Port To Primary Monitor VGA Loopback Port To Workstation...

Страница 16: ...6 Chapter 1 Setting Up...

Страница 17: ...ackplanes should always be serviced by Intergraph field service personnel to guarantee safety Opening the Graphics Tower Open the graphics tower when replacing the Geometry Accelerator board Frame Buf...

Страница 18: ...ve the footstands from the graphics tower 3 If replacing the Expansion Adapter board remove the screw from the top of the right side panel as shown in the following figure Pull up and out on the side...

Страница 19: ...tructed to install them Follow the instructions in the next section to attach an antistatic wrist strap Attaching an Antistatic Wrist Strap Use a disposable or reusable antistatic wrist strap when rep...

Страница 20: ...rization Accelerator and Frame Buffer boards are joined by an interface connector and six screws Both boards must be replaced as a single unit referred to as the board set in these instructions CAUTIO...

Страница 21: ...efully slide the board set into the slot and lower the board extractors to set the connectors into the backplane 2 Replace the screw to secure the board set to the chassis 3 Replace the clock sync cab...

Страница 22: ...n the antistatic bag containing the board until instructed to install it To remove the Expansion Adapter board 1 Disconnect the Adapter cable from the graphics tower 2 Disengage the board from the bac...

Страница 23: ...k switch is engaged Opening the Workstation Base Unit Open the base unit only when servicing the Geometry Accelerator Host Adapter or VGA boards This section describes removing the top cover left side...

Страница 24: ...e the screw on the back of the top cover Pull the top cover back an inch and lift it off the base unit 3 Remove the two screws on the left side panel Pull the panel up and out to remove it Refer to th...

Страница 25: ...harge Some of the sensitive components inside the unit can be damaged by electrostatic discharge To avoid electrostatic discharge take the following precautions after opening the base unit Discharge p...

Страница 26: ...tection will not be effective To attach a disposable antistatic wrist strap 1 Remove the wrist strap from the envelope 2 Unfold the wrist strap and wrap the exposed adhesive side firmly around your ba...

Страница 27: ...ystem 17 Replacing Boards in the Workstation Follow the steps in this section to replace the geometry accelerator host adapter and VGA boards The boards are located in the PCI slots as shown in the fo...

Страница 28: ...the Host Adapter or VGA board disconnect the external cable attached to the board 2 If replacing the Host Adapter board or Geometry Accelerator board remove the FIFO status cable from between the two...

Страница 29: ...you connect the FIFO status cable from the Geometry Accelerator board to the VGA board and then power on the system the Geometry Accelerator board may be damaged and may have to be replaced 5 Replace...

Страница 30: ...r refer to Installing the GL Display Driver in this chapter If video problems persist contact the Customer Response Center at 1 800 633 7248 Obtaining a Usable Video Display There are two methods for...

Страница 31: ...the graphics boards follow these steps To determine a defective unit 1 Save and exit all files if possible 2 Logoff Windows NT if possible 3 Turn off the power to the monitor and to the workstation 4...

Страница 32: ...the IBBS and obtain files Installing the GL Display Driver This section describes installing the GL display driver in case the driver becomes corrupted or inadvertently removed from the workstation Fi...

Страница 33: ...u to choose the currently installed driver or a new driver Select New to install the video display driver 7 When the Video Configuration dialog displays configure the video display as described in Cha...

Страница 34: ...24 Chapter 2 Maintaining the System...

Страница 35: ...iver Disposable antistatic wrist strap Note Documentation parts and an equipment list for the monitor should be included with the monitor shipping package Selecting the Monitor Location Select a suita...

Страница 36: ...on power cord should be connected to an AC outlet to maintain ground After unpacking the equipment open the graphics tower and install the second graphics board set Use a quarter inch nutdriver to rem...

Страница 37: ...around your wrist to prevent the boards from being damaged by electrostatic discharge as you handle them To install the second graphics board set 1 Remove the second graphics board set from its antist...

Страница 38: ...the clock sync cable between the two graphics board sets as shown in the following figure CAUTION The clock sync cable is keyed and can only be installed one way black wire connects to pin 1 Do not fo...

Страница 39: ...ty interlock switch If the interlock switch is not engaged then the graphics tower will not power on Connecting the Second Monitor After installing the second graphics board set finish the upgrade by...

Страница 40: ...nnect the monitor cable from the secondary monitor to the Video port in the secondary monitor slot of the graphics tower as shown in the following figure 3 Configure the GL display driver to utilize t...

Страница 41: ...unit RGA Obtained from Intergraph Customer Response Center FROM Customer Name Customer Contact Phone Mail Address REASON FOR RETURN Notice All returned equipment MUST be shipped in original Intergraph...

Страница 42: ...RGA log number 3 Complete the RGA Form located on the previous page entering the RGA log number obtained from the Customer Response Center The information in the FROM section should be the address to...

Страница 43: ...ville AL 35894 TO Repair Depot RGA _____________ Intergraph Corporation 9805 Kellner Road Huntsville AL 35894 TO Repair Depot RGA _____________ Intergraph Corporation 9805 Kellner Road Huntsville AL 3...

Страница 44: ......

Отзывы: