Intergas 47-291-05 Скачать руководство пользователя страница 49

 

Intergas Heating Ltd

 

49

 

14

 

WARRANTY CONDITIONS 

With due regard for the conditions indicated below, Intergas Heating 
Ltd warrants to the authorised installer the soundness of the 
materials used in and the correct operation of its Central Heating 
products, when used for the purpose for which they are delivered. 
As the occasion arises we should be enabled to ascertain, on site if 
necessary, the soundness of the warranty entitilement. 

The warranty comprises: 

The warranty is limited to the free-of-charge resupply of parts that 
during the warranty period, entirely in our judgement exhibit 
material or manufacturing faults that are not the result of normal 
wear etc. Such parts should be sent to us carriage paid together 
with an indication of the defect and after replacement become our 
property. 

1.

 

The warranty period on parts is 5 years calculated from the 
date of installation. The warranty is effective only if the annex 
to the warranty certificate has been signed by the purchaser 
and returned to us within 30 days of the date of installation.  

2.

 

The warranty period on the water tightness of the boiler’s heat 
exchanger is 10 years, provided however that if, as a result of 
corrosion, leakages arise which in our view cannot be rectified 
on site, we will exclusively supply that boiler part on the basis 
of old for new, calculated at the time of replacement from the 
installation date. 

3.

 

The warranty ceases to apply if it is ascertained that the 
defects, damage or excessive wear are attributable to 
improper use or injudicious treatment or inexpert repair, 
setting, installation or maintenance by unauthorised installers 
or to the product being exposed to substances containing 
aggressive chemicals (including hair lacquer) and other 
harmful substances. 

4.

 

The warranty also ceases to apply if pipes and couplings have 
been used in the installation which can cause oxygen 
diffusion, or if the defect is the result of depositing of boiler 
scale (harmful to the boiler and the installation). 
Surface damage and transport damage are not covered by the 
warranty. The right to warranty ceases to apply if it cannot be 
demonstrated that, after commencement of use, the central 
heating boiler has been serviced at least once a year by an 
installer authorised for that purpose by or on behalf of the gas 
company. The instructions for installation and use which we 
issue for the boilers concerned should be complied with in full. 

5.

 

The manufacturer’s liability under the agreement is expressly 
limited to fulfilment of the warranty obligations defined in this 
article. All claims for compensation, except for those relating 
to failure to fulfil the warranty obligations, are excluded. With 
due regard for the mandatory provisions regarding product or 
other liability, no rights may ever be derived at any time with 
regard to any consequential loss, loss of net worth or any loss 
whatsoever that might arise from defects in materials 
delivered or work performed by the manufacturer.                                                                                                                                                                    
In addition, all offers and agreements concerning deliveries 
and/or services to be made or provided by us are governed by 

        the Conditions of Sale.                                                                
                                                                                                       

A copy of these conditions will be sent to you free of charge on 
request. Conditions to the contrary are expressly rejected.  
6.

 

The warranty is effective only if the annex to this warranty 
certificate has been signed by the purchaser and returned to 
us within 8 days of the date of installation. By signing the 
warranty card the purchaser states his/her agreement that the 
items have been delivered in good condition. 

7.

 

If the installer’s business has been terminated before the end 
of the warranty period, the user may invoke our warranty 
obligations to the installer. 

 
 

Use as intended

 

The appliance, as described in this documentation, is intended for 
heating rooms via a central heating installation and/or for supplying 
hot water. Any other use lies outside the intended use of the 
appliance. No liability can be accepted for loss or damage arising 
from incorrect use. 

15

 

CE DECLARATION 

Declaration of conformity in accordance with ISO IEC GUIDE 22. 

 

Manufacturer

 

Intergas Heating Limitted 

Address 

Building 94 

Bay 1 Vantage Point

 

The Pensnett Estate 
Kingswinford 

DY6 YFS 

 

  

Hereby declares that the CH appliances: 
  
Combi Compact ECO RF 36 
Combi Compact ECO RF 30 
Combi Compact ECO RF 24 

 

 

 

meets the provisions of the following directives: 
 

 

Low Voltage Directive (2006/95/EC)  

 

Gas Appliances Directive (2009/142/EC) 

 

Boiler Efficiency Directive for new oil- and gas-fired central 
heating boilers (92/42/EC) 

 

EMC Directive (2004/108/EC)  

 

R&TTE Directive (1999/5/EG)  *  

 
(*) The declaration of conformity can be obtained from Intergas 
Heating limitted 

 

 

 

H. Bosscher, January 2014 

 

 

 

 

 

 

 

Содержание 47-291-05

Страница 1: ...1 06 ECO RF 36 G C 47 291 07 Installation service and user instructions Please read these installation instructions carefully before installing and using the appliance Keep these installation instruct...

Страница 2: ...th the Benchmark Code of Practice which is available from the Heating and Hotwater Industry Council who manage and promote the scheme Visit www centralheating co uk for more information CONTENT 1 Pref...

Страница 3: ...12 4 Combustion 45 13 Electrical diagram 46 13 1 Electrical diagram Combi Compact ECO RF 46 13 2 TC resistances 47 14 Short spares list 48 15 Warranty Conditions 49 16 CE Declaration 49 17 Gas Boiler...

Страница 4: ...urrently in force Read these instructions carefully before installing or using the appliance It is the installers responsibility that the installation conforms to the current legislation and Standard...

Страница 5: ...llation instructions with the appliance or with the gas meter 1 8 Service and technical support For information about specific adjustments installation maintenance and repair work please contact Inter...

Страница 6: ...ceeding 70kW Part 2 Air Supply BS 5546 2000 Installation of gas hot water supplies for domestic purposes BS 5549 1990 Forced circulation hot water systems BS 6700 1997 Design Installation testing and...

Страница 7: ...7 1 23 7 7 6 27 0 Rated power kW 6 1 18 2 7 7 23 1 8 2 26 6 Max CH water pressure bar 2 5 2 5 2 5 Max CH water temperature C 90 90 90 Other data Gas consumption G20 m3 h 0 58 2 29 0 74 2 91 0 79 3 39...

Страница 8: ...w in flue sets C Boiler controller N Connection block terminal strip X4 D Sensor S1 O Condensate drain pan E Sensor S2 P Hot water sensor S3 F Fan Q Condensate trap G Flow sensor R Heat exchanger H CH...

Страница 9: ...oller An electronic control unit consisting of a boiler controller and separate ignition module which is placed on the gas valve provides direct burner ignition and flame supervision along with contin...

Страница 10: ...e output is automaticaly adjusted to the heating demand by reducing or increasing the fan speed and the pump speed When the end of the central heating demand is reached the thermostat reaches temperat...

Страница 11: ...ault mode See 10 11 5 CH operation An on off thermostat an OpenTherm thermostat an external sensor or a combination of the latter can be connected to the boiler controller When a request for heat is r...

Страница 12: ...iod 4 6 Test programs The boiler controller has a facility for placing the appliance in test mode Activation of a test program will result in the appliance starting operation at a fixed fan speed with...

Страница 13: ...connections on the boiler It is important to thoroughly flush the water circuits after isolating the boiler in order to remove any fluxes and debris from them This should be done particularly where b...

Страница 14: ...p 847000 Bend 45 084661 Bend 90 084660 Deflector kit 081295 Weather slate steep roof 087910 Weather slate flat roof 087372 Extension L 100 incl wall bracket 082975 Horizontal telescopic offset wall te...

Страница 15: ...terminal incl boiler adapter 60 100 082973 Plume management kit 081294 Elbow 90 for plume management kit 081284 Elbow 60 for plume management kit 081285 Extension L 100 incl wall bracket for plume ma...

Страница 16: ...ons backwards 03010091 Appliance wall mounting jig bracket A Supply CH 22 B Return CH 22 C Gas D Cold tap water 15 E DHW 15 F Condensate drain 25 flexible G Drain PRV 15 H 840 Combi Compact ECO RF 36...

Страница 17: ...y be realized by opening a cupboard door Flammable fluids and materials must be stored at least 1 metre away from the boiler The wall on which the boiler is mounted must be sufficiently strong to supp...

Страница 18: ...s through the openings sleeves in the jig Note The appliance is wider than the jig Install the CH heating system and the DHW system to the valves CAUTION Make sure that the boiler connections of the s...

Страница 19: ...at the same time that the pipes slide into the compression fittings 10 Tighten the compression fittings on the mounting bracket Do not turn tightened valves on pipes as this weakens joints within the...

Страница 20: ...on effect during DHW operation mode 8 1 2 Thermostatic radiator valves If all radiators are equipped with thermostatic or radiator valves an auto bypass must be fitted in order to guarantee minimum wa...

Страница 21: ...ections below the appliance must be removed 8 2 2 Flow resistance graph for appliance DHW circuit A Combi Compact ECO RF 24 B Combi Compact ECO RF 30 C Combi Compact ECO RF 36 X Bar Y Litres per minut...

Страница 22: ...crews to remove the front cover 3 Pull the boiler controller unit forwards the boiler controller will tip downwards to provide access 4 Consult sections 8 3 1 and chapter 13 for making the connections...

Страница 23: ...at has te be connected to the contacts 11 and 12 of connector X4 see chapter 13 electrical diagram CAUTION Connecting the Open Therm room thermostat to other contacts than 11 12 may damage the room th...

Страница 24: ...er the menu of the wireless room thermostat in the boiler controller 2 Press the service button once In the display above the button a t is shown 3 Bring the room thermostat in test mode please refer...

Страница 25: ...iagram B Gully C Condensate discharge from boiler D Servicable waste trap E 5 20 mm meter F 100 mm G 110 mm H 450 mm If an externally run condensate drainage pipe is used the following measures should...

Страница 26: ...acing a terminal 600 mm I From a terminal discharging towards another terminal 1200 mm J From an opening in a car port e g door window into a dwelling 1200 mm K Vertically from a terminal on the same...

Страница 27: ...g flue length reductions apply 45 bend 1 metre and for a 90 bend this is 1 5 metres CAUTION Only an Intergas approved flue is to be used with this product Failure to comply with this requirement will...

Страница 28: ...the flue Hatches must be a minimum of 300mm x 300mm and positioned with the edge of the inspection hatch to 1 5m of any joint and at changes of direction Bends should be viewable from both directions...

Страница 29: ...o far as a result of the air bleeding 7 Check all couplings for leakage 8 Fill the condensate trap with water 9 1 2 Hot water supply 1 Open the main tap to pressurise the hot water section 2 Vent the...

Страница 30: ...e mirror proceed to put the boiler into operation as follows 1 Set up the boiler to operate at maximum rate as described in 10 7 2 With the boiler operating in the maximum rate condition check that th...

Страница 31: ...Heat the installation and the appliance to approximately 80 C 5 Check the temperature difference between the supply and return for the appliance and the radiators This must be approximately 20 C For...

Страница 32: ...ted using the installer code 10 1 Directly via the operating panel The following functions can be operated directly 10 1 1 Appliance on off The appliance is started using the key When the appliance is...

Страница 33: ...eter to be set on the service display 4 Using the and keys set the parameter to the desired value visible on the main display 5 Once all desired changes have been entered press the key until a P appea...

Страница 34: ...Start rpm CH 70 60 50 Adjustment range 50 to 99 of the set maximum rpm F Start rpm DHW 70 60 50 Adjustment range 50 to 99 of the set maximum rpm h Max fan rpm 48 50 50 Adjustment range nominal value 2...

Страница 35: ...as soon as the set supply temperature is reached modulate on T flow 10 5 Adjusting pump setting 1 Adjust the pump setting dependent on the maximum power set and the water resistance of the installati...

Страница 36: ...mperature in accordance with the heating line set The maximum supply temperature Tmax is set via the main display If desired the heating line can be changed in the parameter list See 10 3 Heating line...

Страница 37: ...ate a CH demand Test program H HIGH SETTING 5 Select High setting by simultaneously pressing the and buttons twice H appears in service display DO NOT TEST with h in service display Press and again if...

Страница 38: ...ue at max power value at max power Min CO2 value 8 4 9 4 10 Check the CO2 percentage If the values are within the prescribed range the CO2 setting of the boiler is correct If the value is not within t...

Страница 39: ...ement and setting reposition the protection cap A on the gas valve and close the sampling point on the flue adapter 4 Adjust the appliance to the maximum power by simultaneously pressing the keys and...

Страница 40: ...gas valve for gas tightness 10 Switch on the mains power 11 Check the gas connections after the gas valve for gas tightness during operation 12 Now check the setting of the CO2 percentage at high sett...

Страница 41: ...re too low or falling Gas valve or ignition unit not powered 5 Poor flame signal Condensate drain blocked Check adjustment of gas valve Cheack for earth fault 6 Flame detection fault Replace ignition...

Страница 42: ...air adjustment No Weak spark Check the ignition gap Replace the ignition electrode Replace the ignition unit on the gas valve 10 12 3 Burner resonating Possible causes Solution Gas supply pressure to...

Страница 43: ...culation at least 2 or 3 radiators must be open No The boiler power has not been correctly set for the installation Adjust the power See setting maximum CH power No No heat transfer as a result of lim...

Страница 44: ...e the pipe downwards 3 turning it anti clockwise 7 Lift the condensate drain pan on the left hand side from the connection to the condensate trap 4 and turn it to the right with the condensate trap co...

Страница 45: ...n the front cover and the flue pipe components for leakage 13 Check the gas air adjustment 14 Fit the casing tighten the two screws left and right of the display and close the display cover 15 Check t...

Страница 46: ...oller M Main voltage S2 Return sensor V Fan Connector X4 24V 6 7 On off room thermostat 0 1A 24Vdc and or frost thermostat remove connection 6 7 8 9 External sensor 12k ohm 25 C 11 12 OpenTherm thermo...

Страница 47: ...es NTC 12kOhm T C R ohm T C R ohm T C R ohm 15 76020 25 12000 65 2752 10 58880 30 9805 70 2337 5 45950 35 8055 75 1994 0 36130 40 6653 80 1707 5 28600 45 5522 85 1467 10 22800 50 4609 90 1266 15 18300...

Страница 48: ...mens Smart 801527 Ignition module Siemens TQG43 801537 Condensate trap 844187 Flow sensor DHW 844797 Condensate collector 847037 Pressure sensor CH 864087 Seal gas valve inlet 875757 O ring gas restri...

Страница 49: ...installer authorised for that purpose by or on behalf of the gas company The instructions for installation and use which we issue for the boilers concerned should be complied with in full 5 The manufa...

Страница 50: ...Intergas Heating Ltd 50 16 GAS BOILER SYSTEM COMMISSIONING CHECKLIST...

Страница 51: ...Intergas Heating Ltd 51 17 SERVICE RECORD...

Страница 52: ...wa ISO 9001 certified production faccility Intergas Heating Ltd 884587 01 Intergas Heating Limited Telephone 01527 888000 Building 94 Fax 01384 279480 Bay 1 Vantage Point info intergasheating co uk Th...

Отзывы: