background image

7900 ES Slide Rock  Rev. 09/10  

1. 

Install  White  Water  slide  per  installation  instruc-

tions prior to attachment of the Edgestone Slide Rock
panels. 
Legs should be plumb and step should be set at
16  degrees  slope.    IMPORTANT: Correct  step  slope  is
critical to ensure proper fit of the Slide Rock Panels.  

2A. 

Front panel installation (toward pool). Position the

front  panel  along  the  slide.  Make  sure  the  panel  does  not
extend over the pool edge. Starting at the step, make sure
the panel fits correctly down the length of the flume.  

2B.

Use the relief line along step section to help with panel

positioning.

2C. 

The  rear  of  the  panel  has  a  cut  out  of  the  step  to

deck mounting bolt head.

3050 S. ALVERNON WAY

TUCSON, AZ 85713

EDGESTONE  SLIDE  ROCK

Rock Panel Installation Guide

8 0 0 . 7 3 7 . 5 3 8 6

Отзывы: