
I N T E N S E C Y C L E S / /
1 1
C ONNE C T ING R E A R T R I A NGL E TO TOP L INK //
A
Hold washer (PART #130784) against
inside of lower top link mount, then bring
rear triangle forward matching upper
pivot point to top link (IMAGE #13).
B
Match shoulder bolts (PART #130785)
to top link and insert through linkage,
threading bolts into the rear triangle
while holding washer is in place between
bearing and linkage (IMAGE #14 & #15).
c
Tighten shoulder bolts to 175 in/lb
(IMAGE #16).
IN S TA L L ING R E A R S H OC K //
A
Holding rear shock with reservoir above
and forward, insert into frame with lower
eyelet towards shock mount on box link,
then bring forward shock eyelet to
forward shock mount (IMAGE #17 & #18).
B
Install forward M8x60mm shock
mount bolt (#410012) with 8mm washer
(#420004) on bolt head through drive
side of frame to the desired progression
setting (IMAGE #19).
17
13
15
19
18
14
16
Shock curve progression
upper mount: more progressive
lower mount: less progressive
Содержание m16
Страница 1: ...user manual m16 ...
Страница 15: ...I N T E N S E C Y C L E S 1 5 ...