50 AMP Smart Energy Management System Model 900
Next, looking across the other eight columns, find the one that matches the "Load Type" column you just filled in.
Using the number at the top of the column, look in the table below to determine the settings of the three jumpers, JP2, JP3,
and JP4. A "Y" (for yes) means the jumper should be installed and an "N" (for no) means there should not be a jumper
installed.
At the bottom of each column is the Relay Shed Order. This determines which relays will be used for each load. The one
at the top of the column is first to be shed. The one below it will turn off next, and so forth. The loads
MUST
be wired in this
order for the system to operate as desired.
Finally, the number and size of the circuit breakers should be selected to meet the needs of the installation. The breakers
can be either single or dual types. Two of these breakers MUST be 50 Amp units to act as the Main breakers. The
breakers must be obtained and then installed in the box.
(See information on breaker types later in this manual.)
COLUMN
NUMBER
RELAY
SHED
ORDER
(Top is
First Shed)