Installation
】
Before installation, confirm that the work environment meet the
installation require, including the power needs and abundant
space. Whether it is close to the connection equipment and other
equipment are prepared or not.
1. Avoid in the sunshine, keep away from the heat fountainhead
or the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3.
Examine whether the cables be seemly or not
(less than 100m) according to reasonable scheme.
4. Screw, nut, tool provide by yourself.
5. Power need: 24VDC power inputs (12~48DC
)
6. Environment: -25°C to 70°C
Relative humidity 10% to 95%
DIN Rail Installation
In order to use in industrial environments expediently,
IT-ES2010-IU-2GS-4F series adopt 35mm DIN-Rail installation,
the installation steps as below,
1. Examine the DIN-Rail attachment
2. Examine DIN Rail whether be firm and the position be
suitability or not.
3. Insert the top of the DIN-Rail into the slot just below the stiff
metal spring.
4. The DIN-Rail attachment unit will snap into place.
Wiring Requirements
Cable laying need to meet the following requirements,
1. It is needed to check whether the type, quantity and
specification of cable match the requirement before cable laying;
2. It is needed to check the cable is damaged or not, factory
records and quality assurance booklet before cable laying;