![Intellisystem IT-ES1024-IU Series Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/intellisystem/it-es1024-iu-series/it-es1024-iu-series_user-manual_2074872015.webp)
14
【
Installation
】
Before installation, confirm that the work environment meet
the installation require, including the power needs and
abundant space. Whether it is close to the connection
equipment and other equipment are prepared or not.
1. Avoid in the sunshine, keep away from the heat
fountainhead or the area where in intense EMI.
2. Examine the cables and plugs that installation
requirements.
3. Examine whether the cables be seemly or not (less than
100m) according to reasonable scheme.
4. Power: 100-240VAC power input
5. Environment
:
working temperature: -40
~
75
℃
Storage Temperature: -40
~
85
℃
Relative humidity 5%
~
95%
Rack mount installation
In most of industrial application, it is convenience to use
rack mount installation, the step of installation is as follows:
1.
Check if have rack mount installation tools and
components
(The
package
provided
parts
of
components)
2.
Check installation place strong or not, have the place to
install the device or not.
3.
Put the device into rack, aim at the screw hole of device
and rack, fixed it in strong screw. Easy and convenience
to operation.