
1.
INSTALLATION
1.1
CHECK
and make sure that the following
accessories are included inside the
package.
This Operation Manual, Indicator x 1,
Pl stainless steel cover x 1,
Mains adapter x 1, Pillar x 1 and Screws
& tool set x 1.
Contact your dealer if any items are
missing.
1.2
FIXING THE PILLAR
1.2.1
Thread the cable from platform through
the pillar very carefully.
1.2.2
Insert the pillar to the pillar support
attached to the platform in a upright
position, then locked it by the Allen
head screw provided.
1.2.3
Connect the cable plug to the indicator
receiving plug.
1.2.3.1
After plugs are connected, lock the
plugs
by
turning the
plug
screw
in
clockwise direction.
1.2.4
FIXING THE INDICATOR
: Lock the indicator to the pillar by
the screw provided.
1.3
Power on the Scale
1.3.1
Check
the input voltage of the main
adapter/scale matches with the voltage
of electricity outlet. Contact your
local dealer if not.
1.3.2
Before first time operation, plug the
main adapter/mains plug to the wall
outlet and charge the scale for at least
8 hours.
1.4
Retain
the
package
for
future
transportation of scale.