v130G – Marine Satellite Communication System
22
Antenna Installation
Unpacking the wooden crate of v130G
1
2
3
Tips
: Using a Flat-head
screwdriver, remove the clip
as shown in the picture.
Step 1.
When uncrating the wooden crate, follow the procedures below.
1. Locate one of the side panels designed for fork lift. Detach this side panel by removing
the fixing screw (1EA) and clips (8EA).
2. Remove the fixing screws (4EA) and clips (6EA) on the top panel. Detach the top panel
by carefully pulling it as shown in the picture below.
CAUTION
: The side brackets at the edge of the top panel secure the side panels and top
panel in position. When pulling the top panel, ensure that the top panel doesn't fall on the
radome.
3. Remove the fixing screws (5EA) from the remaining side panels, then detach the side
panels with clips on.
Содержание v130G
Страница 1: ...Global Leader in Marine Satellite Antenna Systems v130G Installation and Operation User Guide...
Страница 2: ......
Страница 4: ...INDEX...
Страница 7: ...7 INTRODUCTION Intellian v130G Introduction Intellian v130G Features System Configuration INTRODUCTION...
Страница 12: ...v130G Marine Satellite Communication System 12...
Страница 23: ...23 INSTALLING THE ANTENNA Step 2 Remove 8 screws that mount the ACU box and installation kit box to the pallet...
Страница 25: ...25 INSTALLING THE ANTENNA Step 4 Open the radome hatch Radome Hatch Flat Head Screwdriver min 5mm...
Страница 110: ...v130G Marine Satellite Communication System 110...