Intel SR870BN4 - Server Platform - 0 MB RAM Скачать руководство пользователя страница 6

This Technical Advisory describes an issue which may or may not affect the customer’s product 

 Technical Advisory 

 

TA-788-3

 

5200 NE Elam Young Parkway

 

 

Hillsboro, OR  97124 

Date:June 27, 2006 

Copyright © 2005 Intel Corporation. 

* Other names and brands may be claimed as the property of others. 

  

 

 

TP01842

B

D

E

D

C

A

B1

B3

B4

B2

 

Figure 6.  Installing an MVR 

 

9.  Repeat above steps in the Install Itanium® 2 Processor 9000 Sequence and Install MVR sections for all installed 

processors and MVRs on both the primary and secondary sides of the processor/memory module. 

 

Install the Processor/Memory Module

 

 
1.  Close the processor/memory module and verify that the latches are secure. 
2.  With the uniform levers in the maximum open position, place the module into its housing and slide it until the 

uniform levers contact the front of the chassis. 

3.  Raise the uniform levers to the vertical position to clamp the module into the chassis. 
4.  Push in and lift up on the uniform levers to engage the catches (reverse of figure illustrating release of uniform 

levers). 

Содержание SR870BN4 - Server Platform - 0 MB RAM

Страница 1: ...to upgrade from the Intel Itanium 2 Processor with up to 9MB or 6MB L3 Cache This Technical Advisory documents the process required to perform this upgrade NOTE Upgrading from a system that is configu...

Страница 2: ...system to release the catches 2 Continue to pull down on the levers to cam the module out of its housing Figure 1 Removing the Module 3 Pull the module out of the chassis until it stops 4 To remove t...

Страница 3: ...aimed as the property of others 8 Open the module in the direction of the arrow Figure 2 Opening the Module Remove Power Pods 1 Disconnect the Y cable from the power pod by pushing the connectors whit...

Страница 4: ...efore trying to insert the processor verify that the processor release mechanism is in the open or unlocked position The metal tab should note be visible 2 Place the bolster plate onto a horizontal su...

Страница 5: ...set aside 2 Remove the VR372 connector cap 3 Place the MVR into position on the processor by aligning the two VR372 retention screws into the bolster plate standoffs see letter A in Figure 6 Installi...

Страница 6: ...d Install MVR sections for all installed processors and MVRs on both the primary and secondary sides of the processor memory module Install the Processor Memory Module 1 Close the processor memory mod...

Страница 7: ...ce recovery mode SA81 switch 1 does not need to be toggled 2 At this point the recovery CD should already be loaded into the CD ROM drive One full beep indicates load of SR870BN4D REC from the disk to...

Отзывы: