background image

 

2

Installing the Server Board Platform Confidence Test Package 

The Platform Confidence Test program files are available on the software CD that accompanies the server board.  
Updates to this manual can be downloaded from the Intel support website at: 

http://support.intel.com/support/motherboards/server

.  

 

 

WARNING:

  Each Intel server board has a Platform Confidence Test package specific to that board.  Do 

not attempt to run the wrong Platform Confidence Test package on your server board.  Running the wrong set of 
tests could cause unreliable results and may damage components on the server board. 
 
1.   Insert the resource CD into a Windows* based system and allow the autorun feature launch the graphical user 

interface. If autorun does not launch the GUI, launch it manually by double clicking on your CD-ROM drive. 

2.   On the side bar menu, under 

Utilities

, choose 

Platform Confidence Test

3.   Click on the 

Create Diskette

 icon. When prompted, choose 

run file from current location

. Follow the 

instructions to create a floppy diskette that will contain the Platform Confidence Tests.  

4.   Insert the floppy diskette that you created in Step 3 into the server you want to test. 
5.   Power on the server and allow the system to boot the floppy diskette. 
6.   Read and respond to the license agreement.  After agreeing to the terms of the license agreement, the Platform 

Confidence Test file will expand.  

7.   A RAMDRIVE will be created and the diagnostic tests are copied into it. 
8.   When the copy process is complete, you will be presented with a menu of five options:   

 

• 

Server Diagnostic Options 

• 

Quick Test 

• 

Comprehensive Test 

• 

Comprehensive Test with continuous looping 

• 

Display Help Text 

 

These menu options are discussed in greater detail below. 

 

Summary of Available Tests

 

Quick Tests 

The quick test suite runs a small subset of available tests.  This suite identifies the processor type, speed, and the 
number of processors present.  It also identifies the base and total memory sizes, external L2 cache size, and the 
attached hard disks.  The system will identify drives attached to any SCSI controllers in the system, not just the 
onboard controller.  It will not identify any other SCSI devices (CDROM, tape drives, etc.).   
 
When running the quick test, verify that the configuration that is displayed following the probe includes all of the 
hard disks, memory, and processors that are installed in the system.  If the configuration does not identify all of 
these items, exit by pressing 

<CTRL+BREAK>

 and review the troubleshooting section later in this document.   

 
The quick test duration is dependent upon the number of processors and the amount of memory installed.  With a 
800 MHz processor and 64 MB of memory the quick test will run to completion in about 1 minute.  Each additional 
64 MB of memory adds about 1 minute to the total test time.  
 
On completion of the test and after the test results are displayed, the program returns to the main menu. 

Содержание A96134-002

Страница 1: ...Intel Server Board Platform Confidence Test Installation and Operating Instructions Order number A96134 002 ...

Страница 2: ...icular purpose merchantability or infringement of any patent copyright or other intellectual property right Intel products are not intended for use in medical life saving or life sustaining applications Intel may make changes to specifications and product descriptions at any time without notice The server board intended for use with this software may contain design defects or errors known as errat...

Страница 3: ...VENTIONS 1 ASSUMPTIONS 1 INSTALLING THE SERVER BOARD PLATFORM CONFIDENCE TEST PACKAGE 2 QUICK TESTS 2 COMPREHENSIVE TESTS 3 COMPREHENSIVE TEST WITH CONTINUOUS LOOPING 3 USING THE INTEL SERVER BOARD PLATFORM CONFIDENCE TEST 4 TROUBLESHOOTING 7 ...

Страница 4: ...ent the following conventions are used Selections you need to make from a screen are indicated in bold type such as run file from current location Input that you need to type on your keyboard is indicated by bold and underlined text such as a testmenu When you need to press a specific key on the keyboard the text indicating the key that you should press is enclosed between brackets such as ENTER C...

Страница 5: ...idence Test file will expand 7 A RAMDRIVE will be created and the diagnostic tests are copied into it 8 When the copy process is complete you will be presented with a menu of five options Server Diagnostic Options Quick Test Comprehensive Test Comprehensive Test with continuous looping Display Help Text These menu options are discussed in greater detail below Summary of Available Tests Quick Tests...

Страница 6: ...memory and cache Extensive tests are also run on the onboard peripheral controllers integrated components and the chipset The test duration is dependent on the number of processors and the amount of memory installed With a 800 MHz processor and 64 MB of memory the comprehensive test will run to completion in about 2 5 minutes Each additional 64 MB adds about 2 minutes to the test time The video te...

Страница 7: ...bes the hardware to determine which tests in the suite are applicable to the current hardware configuration Selecting the option Display Help Text results in a display of the help text file for the test options Selecting EXIT saves the test results in a RESULT LOG file and returns you to the DOS prompt Typing testmenu at the prompt will restart the menu system Select the test desired with the curs...

Страница 8: ...olling display of test details is displayed In this display white entries are for information only tests starting test progress internal messages etc green entries indicate successful completion of the test and red entries indicate test failures Use this display as a progress indicator a summary of the results is displayed at the end of the test run An excerpt of the progress log is as follows CAC...

Страница 9: ...PASSED Primary Interrupt Controller PASSED Keyboard Controller PASSED Real Time Clock PASSED PCI Bus Controller PASSED Programmable Interval Timer PASSED Direct Memory Access Controller PASSED SIO308 Super I O Controller PASSED AIC78xx SCSI Controller PASSED COMM1 INS8250 Serial Controller PASSED COMM2 INS8250 Serial Controller PASSED Parallel Port 1 Controller PASSED ATI Video Controller PASSED C...

Страница 10: ...ort Website see URL below 4 If applicable verify the 3 3v sense 2x5pin power connector is attached to the power supply signal connector located next to the server board power connector 5 Ensure the power supply being used is at least 800mA of 5V standby current to support WOL and is required for proper operation System will not boot from the server board resource CDROM An incorrect BIOS Boot prior...

Отзывы: