AMBUS® Link
40
6.8.5. Switching on the level con-
verter
1. Choose the Baud rate of the meter
2. Activate
the level converter
3. Press
The level converter is activated
COMMENT
Filtering the status messages
•
Status details
o
0 - After switching on the device, start process "logger"
o
1 - M-Bus overcurrent
o
2 - Start cloud upload
o
3 - Error cloud upload
o
4 - Cloud upload successfully completed
o
5 - Start FTP/sFTP upload
o
6 - Error FTP/sFTP upload
o
7 - FTP/sFTP upload successfully completed
o
8 - Meter (serial number), reading failed
o
9 - Email transmission failed
o
10 - Error on a meter
•
It is recommended to regularly delete the status messages to prevent
long updating times.