© Intatec Ltd 2012
2
INSTALLATION
Ensure that the system is suitably drained down and all system pressure has been
released.
On open vented systems, make sure that the feed and expansion tank is either isolated
or “tied up”.
When siting the IntaKlean ensure that the collection vessel is positioned to allow access
and removal of the bottom cover, withdrawl of the magnetic element and venting air.
Having removed the prescribed section of pipework, make sure that the open ends of
both pieces are free of debris and ready to receive the nut and olive. Fit both isolation
valves but do not tighten fully.
Ø22 Size =216 Ø28 Size = 231