Instanta Barista Pro SW Series Скачать руководство пользователя страница 3

 

INTRODUCTION: 

 

The “Barista Pro” series of pressurised cafe boilers were introduced in March 1996 and won the 

CEDA award  for  Best Commercial Catering Equipment the same year. They  are  designed to be 

stylish in appearance  but  simple to service. This manual has been designed to be a guide for 

service engineers. It includes descriptions of all serviceable parts and an exploded drawing of a 

complete machine, sub-assemblies and wiring diagrams. 

 

The “Barista Pro”  series are inspected and tested in accordance with the company’s ISO9001 

Quality Management System and ISO14001 Environmental Management System and conform 

with the protection requirements of the following standards and specifications: 

 

 

EMC   

W89/336/EEC Electro-Magnetic Compatibility (EMC) 

EN 50-081-2  Generic Emission 

EN 50-082-2   Generic Immunity  

 

ROHS 

Manufactured in compliance with the requirements of the RoHS Directive 

 

WRAS 

Manufactured in compliance with the requirements of the UK Water 

Regulations/Bylaws 

  

The two models in this range are the same construction, but vary in electrical power rating. 

 

INSTALLATION:  

 

IMPORTANT 

To ensure that the unit works to its full potential, you will require water pressure of at least 30psi 

(2 Bar). If this is not possible, a pump should be fitted. 

Having ensured that the incoming water pressure is adequate, follow these simple instructions: 

1.

 

Provide a suitable stop-cock to isolate the machine for maintenance when needed 

2.

 

Connect the water between the stop-cock and the boiler using the food quality hose 
provided. (do not use red or blue washing machine hoses as these will contaminate the 
water) 

ELECTRICAL SUPPLY 

3.

 

The 3kW model is fitted with a 13amp plug and should be plugged into a suitable socket. 
The 6kW model should be wired into a 30amp switched supply with an ELCB. (Only a 
suitable electrician should undertake this work) 

COMMISSIONING 

    

4.

 

Open the steam tap on the left hand side of the unit 

5.

 

Switch on using the switch on the front panel. The power light will illuminate and water 
will start to enter the boiler. Once the bottom level sensor is reached. the unit will then 
start to heat. When the water boils, steam will start to come from the steam nozzle. The 
steam tap can then be closed.  

6.

 

The pressure in the boiler will start to rise and the needle in the gauge will respond. When 
the needle reaches the pre-set pressure, the ready light will illuminate and the boiler will 
start to fill and heat until it reached the high level sensor. The boiler is then ready to use.  

Содержание Barista Pro SW Series

Страница 1: ...The Professionals Choice SW Series Barista Pro Counter Top Steam Water Boiler British Manufacturing since 1957...

Страница 2: ...release Valve p 4 5 5 0 Water and Steam Syphon Pipes p 5 6 0 Pressure switches p 5 7 0 Heating Elements p 6 8 0 Triac s p 6 9 0 Printed Circuit Boards p 6 7 10 0 The Sensing Probes p 7 11 0 Water Inle...

Страница 3: ...u will require water pressure of at least 30psi 2 Bar If this is not possible a pump should be fitted Having ensured that the incoming water pressure is adequate follow these simple instructions 1 Pro...

Страница 4: ...to approximately 10p s i The heating element s remain on while the inlet valve is energised maximising the products efficiency and performance characteristics The heat fill cycle continues until the l...

Страница 5: ...r should be examined annually for any irregularities by a qualified person 3 0 SAFETY VALVE The boiler is fitted with a safety valve which has a set blow off pressure of 1 8 bar 25 p s i The safety va...

Страница 6: ...ng screw on the switch Before adjustment release the pressure too below the required set pressure 1 The pressure switch on the left marked M or Mains orange wires is the normal operating pressure swit...

Страница 7: ...triac used on the WB 2 Supreme series XE851 SW13 3kw XE854 SW13 6 6kw NOTE From Jan 2014 all 6kW units have 2 x XE851 triacs on One for each element If the triac fails in 90 of cases it will fail in...

Страница 8: ...the sensing probes which acts as an insulator e g the sensor is no longer able to detect the presence of water When the Normal operating sensor black wire becomes insulated the water level will switc...

Страница 9: ...ite adjustment dependant on the particular mains water pressure There have been two types of reduction valves used on this range of machines These valves must be fitted the correct way round See arrow...

Страница 10: ...which if excessive can allow steam to escape through the coupling Also the spring can eventually ware or break causing the steam wand to become floppy The O ring and or the spring can be replaced by...

Страница 11: ...rainer inside aerator body has been replaced the wrong way up The holes in the plastic strainer should point upwards not down 14 0 De scaling Including cleaning the level sensing probes Disconnect the...

Страница 12: ...pen Not Filling Blocked inlet assembly Blocked filter in chromed water connector Water turned off Kinked inlet hose Water pressure too low or high Solenoid coil failed Scaled up top probe Top probe wi...

Страница 13: ...has been detected but other sensor has not 6 The boiler has failed to fill in the allotted time Possible causes 1 The water supply is turned off 2 The inlet valve has failed 3 the water inlet hose is...

Страница 14: ...36 37 LID 35 34 33 32 31 30 29 38 27 P SWITCH MOUNTING 26 BRACKET 28 25 M O 24 23 12 ALUMINIUM TRIAC PLATE 11 10 8 14 6 21 WATER 7 9 22 5 19 20 18 17 STEAM 4 13 2 3 16 15 1 D 19 Supreme 3 6...

Страница 15: ...Draw off tap body Steam TP800 S 18 Grey plastic tap collar XEN303 HT 19 Water dispense arm complete DA104 A 20 Water aerator spray adaptor H FF102 H FF101 21 Draw off tap body Water TP800 22 Pressure...

Страница 16: ...SA14 OUT SOL14 SA14 IN PR5 H FF113 B507 BV11 A C DESCRIPTION UPPER WATER PIPE ASSEMBLY BRAIDED BRASS 1 4 BSP ELBOW 1 2 TO 1 4 BRASS ADAPTOR NON RETURN VALVE 3 4 TO 1 2 SOLENOID OUTLET ADAPTOR SOLENOI...

Страница 17: ...ANDLE ASSEMBLY TP703 TAP WASHER CHROMED TAP BODY Part Nos for Steam Arm TP800 S for Water Arm TP800 XTP1053 TAP STEM XTP802 90 TAP HANDLE V103 O RING TP702 TAP SPRING TAP BONNET HSPT100 TP 1030 TAP PI...

Страница 18: ...G 254mm YELLOW WIRE PRB3 A OVER FILL PROBE ORANGE WIRE PRB4 A WATER INLET ELBOW P GAUGE REFRIGERATION FITTING P GAUGE REFRIGERATION FITTING DATA PLATE CORRECT POSITION OF BOILER TOP COVER PLATE SAFETY...

Страница 19: ...N YELLOW 10 14 GREY 2 GATE RED 4 RED 5 INLET INLET BLACK 8 LIVE in from trip PCB SOLENOID TO LEDs ON FRONT PANEL ON OFF SWITCH PURPLE 19 PURPLE 20 YELLOW 21 ORANGE 22 BROWN 23 RED 24 ORANGE 15 ORANGE...

Страница 20: ...REME BROWN 1 11 16 GREEN YELLOW EMPTY GATE EMPTY INLET INLET BLACK 4 VIOLET 5 LIVE in from trip PCB SOLENOID TO LEDs ON FRONT PANEL ON OFF SWITCH PURPLE 21 PURPLE 22 YELLOW 23 ORANGE 24 BROWN 25 RED 2...

Страница 21: ...ME BROWN 1 11 16 GREEN YELLOW EMPTY GATE EMPTY INLET INLET BLACK 4 VIOLET 5 LIVE in from trip PCB SOLENOID TO LEDs ON FRONT PANEL ON OFF SWITCH PURPLE 21 PURPLE 22 YELLOW 23 ORANGE 24 BROWN 25 RED 26...

Страница 22: ...mtr long electrical cord 3 core 4 0mm Electrical Installation Wire to a least a 30amp single phase supply via an isolation switch DRAIN OVERFLOW Not required INSTALLATION BOILER RATING SPECIFICATION 5...

Отзывы: