background image

 

30 

 

The Ethernet port arrester is only for the 10M/100M copper Ethernet ports with the RJ-45 connector; 

 

The Ethernet port arrester is not provided, the user can purchase them to address their own pratical 

requirements. For the detailed information for the arrester installation, please refer to Ethenet Port Arrester 

Hardware Installation Guide, which contains the technical specification and the maintenance and installation of the 

arrester.

 

You should pay attention to the following conditions during the actual installation to avoid influencing the performance of 

the Ethernet port arrester:   

 

Reversed direction of the arrester installation. You shall connect the external network cable to the “IN” end and 

connect the switch Ethernet port to the “OUT” end. 

 

Poor arrester grounding. The length of the grounding line should be as short as possible to ensure that it is in good 

contact with the switch grounding terminal. Use the multimeter to confirm the contact condition after the grounding.   

 

Incomplete arrester installation. If there is more than one port connected to the peer device on the switch, it entails 

installation of arresters on all connection ports for the purpose of lightning protection.

Содержание 10GEM-001-FCOE Series

Страница 1: ...10GEM 001 FCOE Blade Switch Hardware Installation and Reference Guide V1 00 ...

Страница 2: ...uirements that must be met before the switch can be installed Chapter 3 Product Installation describes how to install the integrated switch and modules and connect its power cables and grounding lines Chapter 4 System Debugging describes the commissioning after the switch is powered on for the first time Chapter 5 Monitoring and Maintenance Chapter 5 Troubleshooting describes possible problems met...

Страница 3: ... 2 This symbol brings your attention to some helpful suggestions and references This symbol means that you must be extremely careful not to do some things that may damage the switch or cause data loss ...

Страница 4: ... N A An SFP port supports both 10Gbase R and 1000base X A QSFP port support both 40G mode and four 10G mode Specifications Model 10GEM 001 FCOE Expansion Module Slot Unsupported Expansion Module Unsupported Fan Slot 2 Power Module Connected to the power connector on the back panel Power Input DC input Input voltage 12 VDC Power Consumption 120 W Optical Module See Appendix B for details The suppor...

Страница 5: ...ht cause radio interference in living environment Users need to take measures to deal with the interference The 10G or 40G Ethernet port of the 10GEM 001 FCOE switch supports direct attach copper DAC cable The SFP port supports 1 meter 3 meter and 5 meter cable and the QSFP port supports 3 meter cable See Appendix B for details Product Appearance Figure 0 1 Appearance of 10GEM 001 FCOE Front Panel...

Страница 6: ...an 1 LED Fan Fan 2 LED Console port System LED Stack LED The 10GEM 001 FCOE switch supports 10G SFP module and 1G SFP module The 10G SFP module cannot be used as a 1G SFP module 9 16 SFP ports can be configured as Fiber Channel ports Back Panel Figure 0 3 Back Panel of 10GEM 001 FCOE ...

Страница 7: ...dule is operational in Master mode Solid green The stack module is operational in Slave mode Fan 1 LED FAN1 Off The fan is not in position Solid green The fan is operational Solid orange The fan is faulty Fan 2 LED FAN2 Off The fan is not in position Solid green The fan is operational Solid yellow The fan is faulty SFP port LED 1 8 Ethernet mode Off The ports are not linked Solid green The ports a...

Страница 8: ... 5 The switch fabric module is mounted at the rear of the blade server Heat is dissipated by fans on the module panel Figure 0 4 Ventilation and Heat Dissipation of the 10GEM 001 FCOE ...

Страница 9: ...he dismantling Removal Safety Avoid frequent removals after the device is installed Turn off all power supplies and unplug all power cords and cables before the installation or the dismantling When removing the device pay attention to the balance and avoid hurting legs and feet or straining the back When the device is being removed do not hold the power supply handle or the fan handle for these pa...

Страница 10: ...es a great consideration to prevent electrostatic discharge damage and adopts multiple measures But if the electrostatic exceeds certain limit it can still cause great damages to the circuitry and the device In networks connected by the 10GEM 001 FCOE the major sources of electrostatic induction are outdoor high voltage transmission cables lightening indoor floor materials and the machine structur...

Страница 11: ...ing the air intake Temperature and Humidity Requirements To ensure the normal operation and a prolonged service life of the 10GEM 001 FCOE maintain an appropriate temperature and humidity in the equipment room The equipment room with too high or too low temperature and humidity for a long period of time may damage the equipment In an environment with high relative humidity the insulating material ...

Страница 12: ...5 H2S 0 006 0 03 NO2 0 04 0 15 N2 0 05 0 15 Cl2 0 01 0 3 System Grounding Requirements A good grounding system is the basis for the stable and reliable operation of the 10GEM 001 FCOE series switch It is the key to prevent lightning stroke and resist interference Please carefully check the grounding conditions on the installation site according to the grounding requirements and perform grounding p...

Страница 13: ...e device but can be controlled by a filter Radiated interference may affect any signal path in the device and is difficult to shield Effective measures should be taken for the power system to prevent electric grid interference The working ground of the routers should be properly separated and kept as far as possible from the grounding device of the power device or the anti lightning grounding devi...

Страница 14: ...A normal delivery should contain the above mentioned items which may differ from the actual delivery depending on purchase contracts Please check your goods carefully according to the packing list or purchase contract If you have any questions or there are any errors please contact your distributor ...

Страница 15: ...uirements have been met Installation Flowchart Installation Verification Verify the following requirements before installation The installation location provides sufficient space for heat dissipation The installation location meets the temperature and humidity requirements of the equipment The related network cables have already been deployed at the installation location ...

Страница 16: ...e operational Pull out levers before mounting and push them back after mounting is completed Steps Pull out both levers with both hands in figure 3 1 Insert the module into the slot along the slide rail and drive it ahead smoothly in figure 3 2 Push both levers toward the slot in figure 3 2 Figure 3 1 Pulling out the levers Figure 3 2 Insert the module into the slot ...

Страница 17: ...o the Console interface of the supervisor module with shipped console cable and connect the DB9 connector to the NM or control terminal By default the baud rate is 9600 data bit 8 parity check none stop bit 1 and flow control none Connecting Cables to External Ports Precautions ...

Страница 18: ...e at the connector Steps Insert the single mode or multi mode fiber into the appropriate port according to the identification on the panel of the line card Distinguish the Rx Tx end of the fiber Installation Verification Verify that the switch fabric module is totally inserted into the slot ...

Страница 19: ...the PC 2 Connect one end of the console cable mini USB to the console port of the switch Setting Terminal Parameters Start the PC and run the terminal simulation program on the PC such as Terminal on Windows 3 1 or HyperTerminal on Windows 95 98 NT 2000 XP Step Two Set terminal parameters The parameters are as follows baud rate 9600 data bit 8 parity check none stop bit 1 and flow control none Det...

Страница 20: ...mn of Connect Using field select the serial port you want to use Figure 0 3 4 After the serial port is selected click OK The Serial Port Parameter Setting window is displayed as shown in Figure 4 4 Set the baud rate as 9600 data bit as 8 parity check as none stop bit as 1 and flow control as none Figure 0 4 ...

Страница 21: ... the power supply voltage complies with the requirement of the switch Check if the console cable is correctly connected the terminal can be a PC used for configuration is already started and the parameters are already configured Checking after Power on Recommended After power on you are recommended to perform the following checks to ensure the normal operation of follow up configurations Check if ...

Страница 22: ...commands including Working status of host Port configuration and status Temperature status For the monitoring commands see 10GEM 001 FCOE series Switch Configuration Guide Hardware Maintenance Expansion Module Maintenance To replace a board do replacement according to the instructions provided in Product Installation Replacing Lithium Battery The built in lithium batteries can support the real tim...

Страница 23: ...eshooting Flowchart Common Troubleshooting Fault 1 The system login password is lost Fault Description The system login password of the switch is forgotten or lost and so it is not possible to configure the data Troubleshooting ...

Страница 24: ...of the serial port Check if the settings of such parameters as the baud rate match those in 10GEM 001 FCOE Switch Configuration Guide Fault 4 The link cannot be set up between fiber interfaces Fault Description The system runs normally After the fiber interface is inserted into the optical module and the optical fiber is properly connected the link cannot be set up Troubleshooting 1 Check whether ...

Страница 25: ...IEC TR24750 TSB 155 Max Transmission Distance 100 m 100 m 100 m 37 m to 55 m Cabling System Bandwidth 600 MHz 500 MHz 250 MHz Description Meet the minimum performance requirements of 10Gbase T standard Strictly follow TSB 155 standard requirements to ensure the reliable application of 10Gbase T The maximum transmission distance will be less than 37m when CAT6 UTP unshielded wire is exposed in seve...

Страница 26: ...r standard The 1000BASE T port uses four pairs of wires for transmission all of which must be connected Figure A 1 shows the connection of the twisted pairs used by the 1000BASE T port Figure A 1 Four twisted pairs of the 1000BASE T In addition to the above cables the 100BASE TX can use up to 100m of 100 ohm CAT5 Figure A 2 shows the definition of pin signal concerning the 100BASE TX Figure A 2 De...

Страница 27: ...For the fiber ports select single mode or multiple mode fibers for connection according to the fiber module connected The connection schematic diagram is shown in Figure A 4 Figure A 4 Schematic Diagram for Fiber Connection ...

Страница 28: ... Type DDM Supported Yes No Intensity of Transmitted Light dBm Intensity of Received Light dBm min max min max FE SFP LX MM1310 1310 MF Yes 22 14 30 14 FE SFP LH15 SM1310 1310 SF Yes 15 8 28 8 Mini GBIC SX 850 MF No 9 5 3 17 0 Mini GBIC LX 1310 SF No 9 5 3 20 3 GE eSFP SX MM850 850 MF Yes 9 5 3 17 0 GE eSFP LX SM1310 1310 SF Yes 9 5 3 20 3 Mini GBIC LH40 1310 SF Yes 2 3 22 3 Mini GBIC ZX50 1550 SF ...

Страница 29: ... 11 3 1 The existing 10 G SFP copper modules Model Module Type Connector Type Copper Cable Length m Conductor Wire Diameter AWG Data Rate Gb s DDM Support ed Yes No XG SFP CU1M Passive SFP 1 28 10 3125 No XG SFP CU3M Passive SFP 3 28 10 3125 No XG SFP CU5M Passive SFP 5 26 10 3125 No Models and Technical Specifications of the 40G QSFP Module The existing 40G QSFP optical modules Model Wavelength n...

Страница 30: ...m Modular Bandwidth MHz km Max Cabling distance Intensity of Transmitted Light dbm Intensity of Received Light dbm DDM Suppor ted Yes N o min max min max FC2G SFP S R MM8 50 850 MF LC interf ace 62 5 125 N A 300m 1G 150m 2G 9 3 18 0 YES 50 125 N A 550m 1G 300m 2G FC4G SFP S R MM8 50 850 MF LC interf ace 62 5 125 N A 300m 1G 150m 2G 70m 4G 9 2 5 15 0 YES 50 125 N A 550m 1G 300m 2G 150m 4G FC8G SFP ...

Страница 31: ...cable row and then gets to the switch Figure C 1 Schematic Diagram for the Power Arrester The power arrester is not provided and the user should purchase it to address the practical requirement Precautions for installation Make sure that the PE terminal of the power arrester has been well grounded After the switch AC power plug is connected to the socket of the power arrester lightning protection ...

Страница 32: ...r the other side of the protection paper for the double sided adhesive tape and paste the Ethernet port arrester to the switch framework The paste location for the Ethernet port arrester should be as close to the grounding terminal of the switch as possible 2 Based on the distance of the switch grounding terminal cut the grounding line for the Ethernet port arrester and firmly tighten the groundin...

Страница 33: ...ing the actual installation to avoid influencing the performance of the Ethernet port arrester Reversed direction of the arrester installation You shall connect the external network cable to the IN end and connect the switch Ethernet port to the OUT end Poor arrester grounding The length of the grounding line should be as short as possible to ensure that it is in good contact with the switch groun...

Страница 34: ...ve diameters After cabling is fixed the bend radius of a common coaxial cable should be over seven times greater than its diameter The bend radius of this type of cables that often bend or suffer removal insertion should be over 10 times greater than its diameter The bend radius of a high speed cable SFP cable for example should be over five times greater than its diameter The bend radius of this ...

Страница 35: ...he metal hole traversed by cables should have a smooth and fully rounding surface or an insulated lining Proper buckles should be selected to bundle up cables It is forbidden to connect two or more buckles to bundle up cables After bundling up cables with buckles you should cut off the remaining part The cut should be smooth and trim without sharp corners as shown in Figure D 2 Figure D 2 Bundling...

Страница 36: ...s of moving parts The power cables connecting moving parts such as door grounding wires should be reserved with some access after assembled to avoid suffering tension or stress When the moving part reaches the installation position the remaining part should not touch heat sources sharp corners or sharp edges If heat sources cannot be avoided high temperature cables should be used When using screw ...

Страница 37: ...undled up into cable bunches with cables in cable bunches clean and straight Binding by using buckles should be performed according to Table D 1 Cable Bunch Diameter mm Binding space mm 10 80 150 10 30 150 200 30 200 300 No knot is allowed in cabling or bundling For wiring terminal blocks such as air switches of the cold pressing terminal type the metal part of the cold pressing terminal should no...

Отзывы: