www.insigniashowers.com
Last Modified: 08/12/2021
06
All connections
MUST
be carried out by an approved part P
electrician and a minor works certificate must be issued upon
completion. This product is NOT designed for DIY install and
improper installation could be fatal.
Please use correct size and type to meet electrical codes.
Leave 2 feet of slack wire at generator location for finish hook
-
up. Connect the generator to a dedicated circuit breaker.
A.
Route the supply wire through the hole marked
POWER.
B.
Connect the supply wires to terminals marked L1, L2
& L3 and N. Please see Diagram for 240v Conversion
C.
Connect the ground to the ground screw marked
accordingly.
Electrics
We recommend a BAR pressure between 2.5 and 3.4 BAR.
If you have a combi boiler system no problem should be
experienced. If you have a gravity feed older type
installation (hot water tank type usually less than 1 BAR)
you will almost certainly need a pump. We cannot advise
on which type of pump is used, location or design because
all house plumbing layouts vary. This is a job for your
installer/plumber. The end delivery however must fall
within the scope above.
Important Note
Do not exceed 3.4 BAR pressure under any
circumstances. Warranty is void if so as damage will occur.
If you have a combi supply, please use a pressure reducing
valve if required to lower the BAR pressure to the shower.
Please Remember that this product is free standing and is
designed to be pulled away from the wall.
The waste hose must be of a flexible type
(Supplied. Note:
Not suitable for solvent type joints)
The water supply pipes must be that of a flexible braided
type
(not supplied).
DO NOT OVERTIGHTEN THE BRAIDED HOSES AS IT CAN
CAUSE THE CONNECTION TO POP AFTER A FEW WEEKS OF
USE.
Always fit easy to get to isolation taps on both hot and cold
water supply (not supplied). Just like a dishwasher or
washing machine, this product
MUST
be isolated when not
in use.
•
Scissors
•
Knife
•
Spirit Level
•
Tape Measure
Pressure/Water Requirements
Tools Required
•
RubberGum (supplied)
•
Plumbers Mait (not supplied)
•
Hot and cold isolation valves (not supplied)
•
Suitable McAlpine type 40 mm compression
coupling for waste to house connection.
•
3x Braided hoses (not supplied). If you haven
’
t
purchased these already, simply click the following
link below or copy in to any web browser. For ease
we have listed the required pack below for your
install.
•
Shower cabins with steam require
pack 2
https://www.insigniashowers.com/wras
Parts Required
You will require:
•
Philips Screwdriver
•
Electric Drill
•
Safety Gloves
•
Safety Glasses
Single Phase 220/240v
Connect 3 x live wires
in to (L1) then (L2) and
(L3). Connect the 1
neutral Cable in to
position (N) & finally 1
x Earth Cable to the
earth screw on the
plate.
Connect 1 x live wire in to
(L1) then bridge (L1+L2)
and (L2 + L3) as show in
the picture above. Connect
the 1 neutral Cable in to
position (N) & finally 1 x
Earth Cable to the earth
screw on the plate.
3 Phase 380v