www.insigniashowers.com
Last Modified: 16/08/2021
24
Signing off your shower
Now your shower is assembled, there is just few steps before you can sign the shower off.
1. Please ensure ALL the connections are watertight including waste, pre
-
fitted body jets as clips are only lightly
tightened in place for transit and can be dislodged, internal and external hoses and steam connections (model
dependent)
2. Once you are happy, check the shower functions by switching on the overhead shower and then adjust the
selector knob (top knob) to the hand shower and then onto the body jets. Whilst the water is running, check
external hoses for any signs or water drips or leaks and tighten accordingly.
Please note, when testing the body jets, water will shoot towards the open doors and the user.
3. Do not aim the hand shower directly at the joints of your shower as this does not fall under
“
normal showering
conditions
”.
However, due to Insignia
’
s unique design of the shower tray, water will only leak back in to the tray so you
won
’
t get flooded.
4. Visually check the water flow in to the waste and adjust the feet of the tray accordingly to ensure the direction
of the water flows towards to the waste to prevent over puddling (a small amount of puddling is normal).
5. Never use the shower until all checks have been made and the installer is 100% happy in the knowledge no hose leaks
are present.
6. Any RubberGum which has squeezed out between the panels and the tray, simply cut off using a sharp, clean knife
blade.
7. Now push the shower from it
’
s base into it
’
s final position.
NEVER PUSH THE GLASS OR FRAME
into its final resting
position.
Happy Showering!
Содержание Monochrome MC90SQ
Страница 5: ...www insigniashowers com Last Modified 16 08 2021 05 ...
Страница 9: ...www insigniashowers com Last Modified 16 08 2021 09 ...
Страница 10: ...www insigniashowers com Last Modified 16 08 2021 10 ...
Страница 11: ...www insigniashowers com Last Modified 16 08 2021 11 Step 1 Level the Tray and connecting the waste ...
Страница 13: ...www insigniashowers com Last Modified 16 08 2021 13 Step 3 Installing the Water Valve and Hand Shower Holder ...
Страница 14: ...www insigniashowers com Last Modified 16 08 2021 14 Step 3 Installing the Glass Shelf and Back Panel Seals ...
Страница 15: ...www insigniashowers com Last Modified 16 08 2021 15 Step 4 Installing the Back Panels ...
Страница 16: ...www insigniashowers com Last Modified 16 08 2021 16 Step 5 Installing the Upright Profiles ...
Страница 17: ...www insigniashowers com Last Modified 16 08 2021 17 Step 6 Installing the Top Bottom Rails ...
Страница 18: ...www insigniashowers com Last Modified 16 08 2021 18 Step 7 Installing the Front Fixed Glass ...
Страница 19: ...www insigniashowers com Last Modified 16 08 2021 19 Step 8 Installing the Door Wheels Seals and Handles ...
Страница 20: ...www insigniashowers com Last Modified 16 08 2021 20 Step 9 Installing the Doors ...
Страница 21: ...www insigniashowers com Last Modified 16 08 2021 21 Step 10 Installing the Roof ...
Страница 22: ...www insigniashowers com Last Modified 16 08 2021 22 Step 11 Installing the Water Connections ...
Страница 23: ...www insigniashowers com Last Modified 16 08 2021 23 Step 11 Installing the Water Connections continued ...