www.insigniarange.com
Last Modified 08/02/2018
11
Whilst the next steps show you how to assemble your shower we want to make sure you have a correct build to ensure you get a
trouble free shower. Therefore our advice is to follow the instructions and perform a dry run to ensure you are confident with the
build and you understand fully how the unit is assembled. When we use the word
“
DRY RUN
”
this means you do not silicone
anything, just simply construct the shower, align, drill and screw everything together. Once you are happy with the build take the unit
apart and carry out the final fix.
TO START
Make sure you have a clear space, remember when finished and in place you need access
to check your build and able to pull the shower out for servicing or should you have the need
to replace anything!
Take the shower tub and remove all the protective wrapping and fit the waste. In the side of
the waste supplied in the optional fitting kit you will notice a spigot not seen on an ordinary
waste. In most cases this is blanked yet should you have a steam version you need to gently
drill this out as this item is for the steam generator drainage and will be connected in the
instructions later.
Now please level the tray by firstly placing the tray in its final location and then using a spirit
level, adjust the tray feet accordingly. Once you are happy with the levelling of the tray, you
can pull it out to begin the main construction.