background image

 

www.insigniarange.com

 

Last Modified: 18/12/2017

 

 13 

Step 3 (Continued)

 

The next step is to attach both front uprights to the curved rails using 

the 

ST35

 screws as shown in the picture to the left 

 

PLEASE NOTE

 

The screw head needs to bypass the OUTER hole. If this does not 

occur please bore out the outer hole only by about 2

-

4mm

 

Your front metal work should now look like this

 

Step 3 (Continued)

 

Please Note: 

 

With the groove sitting on the tray, you need to 
have the 

U

” 

shaped channel facing inwards to 

allow the glass to be inserted correctly.

 

Содержание INS5000L

Страница 1: ...nty contact www insigniarange co uk customerService aspx Spares Replacements Parts outside of your warranty contact 0844 800 3069 www insigniarange co uk WARRANTY REG NO __________________________ To...

Страница 2: ...Electrical Requirements What s In The Boxes Screw Pack Contents Plumbing Requirements Schematics Starting The Installation Electric Box Connections Steam Generator Connections Sealing and Water Testi...

Страница 3: ...ny years to come Like everything in order to obtain a first class product that will serve you well for many years the effort and correctness put into the assembly will reflect in the quality of your f...

Страница 4: ...D ELECTRICAN COMPANY TO COMPLETE THE CONNECTION FROM SHOWER TO THE HOUSE SUPPLY LAWS DEMAND IN MANY CASES YOU DO THIS AND YOUR WARRANTY IS VOID IN REGARDS TO THE ELECTRICAL ITEMS IF THIS IS NOT UNDERT...

Страница 5: ...cone Gun Spirit Level Tape Measure Philips Screwdriver Electric Drill Adhesive Requirements Bacteria Resistant Sanitary Silicone for vertical joints RubberGum Plumbers Mait for waste joints Supplied N...

Страница 6: ...ician This product comes with 13 amp plug s fitted with an RCD unit We leave it this way for you to connect this your own way due to continued additions to current regulations 1 Connect within current...

Страница 7: ...s assembled When we use the word DRY RUN this means you do not silicone anything just simply construct the shower align drill and screw everything together Once you are happy with the build take the u...

Страница 8: ...ts can be obtained free of charge during or after the build Any claims can only be within the timescale permitted 48 hours after delivery and always BEFORE build Product Code Description Quantity SP09...

Страница 9: ...r plumber The end delivery however must fall within the scope above Important Note Do not exceed 3 4 BAR pressure under any circumstances Warranty is void if so as damage will occur If you have a comb...

Страница 10: ...www insigniarange com Last Modified 18 12 2017 10...

Страница 11: ...you need to gently drill this out as this item is for the steam generator drainage and will be con nected in the instructions later Now please level the tray by firstly placing the tray in its final...

Страница 12: ...ment run a bead of silicone up the edge and apply Rubbergum along the bottom of the pan els and screw together using the ST20 Step 3 Front Fixed Uprights PLEASE NOTE The uprights have small grooves cu...

Страница 13: ...the picture to the left PLEASE NOTE The screw head needs to bypass the OUTER hole If this does not occur please bore out the outer hole only by about 2 4mm Your front metal work should now look like...

Страница 14: ...ep 5 Next attach the U shape rubber glass seal to the outer edge of the curved and the straight fixed glass panels and cut any excess of if required Once you are happy with the alignment run a bead of...

Страница 15: ...locate and fix the glass panels into place by pushing them as per the arrows in the adjacent image Making sure the edge of the glass with the rubber seal fits into the Step 7 Using the ST25 screws en...

Страница 16: ...nsure the wheels are at their lowest position and hang on the inner curved rails with the wheels facing the outside of the glass Please note the push button wheels are for the bot tom Once all wheels...

Страница 17: ...sting glass holes with a knife to provide an efficient smooth fitting and location of the accessories We recommend using a screwdriver on the smaller holes Riser Bar 1 Attach the chrome holder to the...

Страница 18: ...ush the probe through from the rear of the cabin ensuring the probe protrudes no more than 6mm Place a small amount of silicone behind to fully secure in to place Ozone o3 Unscrew the chrome pepper po...

Страница 19: ...nd Once this is done the lights simply push onto the fitting Start on one side with the light closest to the middle as shown below Follow the lights around and finish back where you started so you can...

Страница 20: ...our water to the shower and note which output the water exits from then turn off the water and swap over the relevant hose Alternatively remove the outer chrome knob by removing the chrome cap and loo...

Страница 21: ...www insigniarange com Last Modified 18 12 2017 21 Electric Box Connections Roof Light Speaker Antenna 12V power Supply Thermostatic probe Speaker Ozone...

Страница 22: ...white steam pod within your shower Make sure these are fitted in the correct position as they are only attached for transportation reasons only Water Inlet Connect a braided hose from the shower valv...

Страница 23: ...om one side and going around to the back and then to the other side finishing at the front If you have a small leak normally caused through insufficient sealer or air bubble on assembly dry the area t...

Страница 24: ...e timer Button 3 Up Arrow Radio search higher frequency music track next song volume increase Button 4 Audio select To tune your radio channels firstly press the Audio Select button which looks like a...

Страница 25: ...nlock the panel Please Note When the control panel is locked none of the buttons will work except the unlock key Button 7 Down Arrow Radio search lower frequency music track previous song volume decre...

Страница 26: ...contains many useful items such as is your parts warranty registered advice on cleaning servicing your shower cabin fault finding and many more items This is a MUST to read and not just HELP It saves...

Страница 27: ...SP300 Waste hose SP187 Drain Hose SP234 Vertical steam genera tor Electric Box SP308 Magnetic door seals SP310 Rear door seals SP173 SP126 SP045 SP182 SP043 3 Port 3 Feed thermo static valve 3 Port S...

Страница 28: ...used in any way shape or form with out written permission from Maclean International Ltd Images are NOT permitted to be saved printed or uploaded Violation of copyright laws are punishable by law All...

Отзывы: