insigniarange.com
Last Modified: 23/01/2014
09
TO START
Make sure you have a clear space, remember when finished and in place you need access
to check your build and able to pull the shower out for servicing or should you have the need
to replace anything!
Take the shower tub and remove all the protective wrapping and fit the waste. If you
purchased the fitting kit it is possible this may have already been fitted in the tray hole yet
please note this is only for transportation reasons therefore you will still need to ensure the
correct sealing and alignment is carried out. In the side of the waste supplied in the optional
fitting kit you will notice a spigot not seen on an ordinary waste. In most cases this is blanked
yet should you have a steam version you need to gently drill this out as this item is for the
steam generator drainage and will be connected in the instructions later.
Now please level the tray by firstly placing the tray in its final location and then using a spirit
level, adjust the tray feet accordingly. Once you are happy with the levelling of the tray, you
can pull it out to begin the main construction.
Step 1
Run a bead of silicone along the edge and bottom of the large squared
side glass panel and the angled back panel glass and place onto the tub
and screw together using the
ST20
screws