7
System Power-Up:
Follow these steps before powering up the system.
1. Plug in your power cable in the back of the system with
external power outlet.
2. Plug in the crawler controller into the specified USB port.
3. Connect the crawler to the mainline cable receptacle.
4. Tighten your strain relief clamp using the provided 3-32
Allen wrench.
5. Set your camera height to desired pipe diameter.
6. Switch power toggle on back of the system to the on
position.
7. Press the power button on the face of the system.