- 38 -
3 Wiring
3
3.1.4 Power Supply Wiring Example
Models using single-phase 220 V power: SV820N1S2C2C
Figure 3-5 Main circuit wiring for single-phase 220 V power
Noise filter
L1C
L2C
L1
L2
U
V
W
ALM-
ALM+
24V
COM
P
C
X1/X2
Single-phase
220 V AC
1Ry
1KM
Surge
protection
device
(SPD)
1D
Main circuit
power input
contactor
Run
button
Stop
button
Servo alarm
output relay
Servo alarm
indicator
Servo alarm
signal output
Servo Drive
PG
M
N
Note
● 1KM: Electromagnetic contactor; 1RY: Relay; 1D: Flywheel diode;
● DOs are set as fault output (ALM+/-); when the servo drive alarms, the power supply is cut
off automatically. This series does not have a built-in bleeder resistor, therefore connect an
external bleeder resistor between P and C if required.
Models using three-phase 220 V power: SV820N1S2C2C
Содержание SV820N Series
Страница 127: ...126 6 Trial Running 6 6 5 6 PLC Program 1 Add an FB file that edits the function block in the application...
Страница 128: ...127 6 Trial Running 6 2 The definition part of FB 3 Five function blocks in FB...
Страница 141: ...140 6 Trial Running 6 In section0 call the function block then the axis can be moved by the bus...
Страница 143: ...142 6 Trial Running 6 3 Open Visual studio and create a New Twincat3 Project...
Страница 146: ...145 6 Trial Running 6 Click OK Click OK...
Страница 147: ...146 6 Trial Running 6 Click Yes Click OK...
Страница 149: ...148 6 Trial Running 6 C The default RPDO list is as follows...
Страница 150: ...149 6 Trial Running 6...
Страница 152: ...151 6 Trial Running 6 7 Activate the configuration and switch over to the running mode Click...
Страница 157: ...156 6 Trial Running 6 Add a motion control library making it easy to call the control function block...
Страница 158: ...157 6 Trial Running 6 Create a new POU...
Страница 159: ...158 6 Trial Running 6 Create a new FB add MC_power MC_jog MC_home MC_absolute MC_reset to FB...
Страница 160: ...159 6 Trial Running 6 Call axis_motion in main Call the program in PLCTASK...
Страница 161: ...160 6 Trial Running 6 Compile the program if there is no fault configuration can be activated and then log in to the PLC...
Страница 181: ...Revision History Date Revised Version Revised Details May 2017 A00 First release...