
Connect the water pipe:
Left for hot water, right for cold
water.
Caution!
Flush the hot and
supplies before you start the
installation.
1-
Water sealing test:
Use screwdriver close the stops,
open the water pipe to test the
waterway sealing. If the sealing is
not good, fix it then go to next
step.
3-
Trim installation preparation:
Make sure you have these spare
parts before you go to next
step.
thermostatic mixer handle(1),
cap(2), handle screw(3), diverter
handle(4), plastic washer(5),
plastic washer(6), cap(7),
handle screw(8), allen key(9),
escutcheon(10)
4-
Insert the Valve to the wall:
Leave enough space for the valve
on the wall, insert the valve
and adjust the valve space
between 68mm to 78mm(2.67” to
3.07”) , using spirit level to
adjust the two salient point at
same level, then fix the valve and
put on tiles.
Caution!
Please check the tile
thickness, make sure the plastic
surface not go beyond the
tile surface.
2-
X
Mixed
Mixed
Mixed
Cold
Hot
X
1
6
7
8
9
10
2
3
4
5
Close
Open
2.67”~ 3.07”
For warranty issues call us at 1-855 472 4304 or send us an e-mail at [email protected]
For questions call us at 1-855 472 4304 or visit our website at www.inolav.com