Innovative Cordex 125-4.4kW010-589-20 Скачать руководство пользователя страница 15

 

010-589-B2  Rev B

 

Page 8 of 19 

 

Wiring and Connections 

Cordex 125-4.4kW modular switched mode rectifier. 

5.1 

Safety Precautions 

WARNING  
Hazardous AC voltages may be present. Ensure power at the AC service panel is off before 
attempting work on the AC connections. Use a voltmeter to verify the absence of voltage. Clearly 
mark the correct polarity of the battery leads before commencing work on DC connections. 

Refer to the previous (Installation) chapter for additional safety precautions. 

5.2 

Tools Required 

Various tools are essential for product installation. Use this list as a guide: 

 

Slot head screwdrivers (blade sizes: 1/4", 1/8", 1/16") 

 

Philips head screwdriver, #2 (tip size 3/16") 

 

Digital voltmeter equipped with test leads 

 

Adjustable 125/220Vdc load (optional) 

 

Cutters and wire strippers 

 

Crimping tool (optional for large gauge wire) 

 

Socket and rachet set (Imperial measure). 

5.3 

Power System Chassis Ground and DC Ground Reference 

WARNING  
For safety reasons, ensure the system is properly bonded to the building’s ground grid.  
125/220Vdc systems are typically floating; i.e., not connected to earth ground. 

Connect the chassis ground to the site ground to ensure correct operation of the system and to prevent drifting 
floating analog (especially current) readings. 

5.4 

AC Feeder Protection/Sizing 

To maximize system reliability, each power module should be fed from a dedicated protection feeder breaker 
located at the AC distribution panel. The feeder breaker can also act as the disconnect device for the connected 

5.5 

AC Input Connections 

WARNING  
Use care when removing or replacing the covers for the AC input connections. Never assume that 
an electrical connection or conductor is not energized. 

CAUTION: AC input wires should be routed in flexible or rigid conduit as far away as possible 
from the DC power wires to minimize EMI disturbances. 

Ensure all modules are removed from the shelf. 

The wireway is designed for two customer-supplied 1” conduit fittings for AC supply located one on each side of 
the shelf.  

Remove the metal covers (2 places) from the rear of the shelf to expose the AC input terminal blocks, L1 and L2 
for each rectifier. Each terminal pair relates to an individual power module as marked. 

Attach the conduit retainers to the wireway hole(s) and route the AC cables through.  

Secure the wires to the AC input and chassis ground terminals as required.  

This chapter provides cabling details and notes on cable sizing for DC applications with respect to the 

IE - 

module. Refer to the specifications at the front of this manual for 

IE recommendations. 

Содержание Cordex 125-4.4kW010-589-20

Страница 1: ...ched Mode Rectifier Installation Operation Manual Part 010 589 B2 Effective 01 2013 P 64 9 835 0700 F 64 9 837 3446E info innovative co nz W www innovative co nz Innovative Energies Ltd 1 Heremai Stre...

Страница 2: ......

Страница 3: ...this manual to provide the necessary information required for installation operation and fault diagnosis of the unit Installation and Operation Instructions 010 589 B2 Specifications Cordex 125 4 4kW...

Страница 4: ......

Страница 5: ...rkings on the product and any equipment connected to the product 4 Do not expose the product to rain or snow install only in a clean dry environment 5 CAUTION Unless otherwise noted use of an attachme...

Страница 6: ...terials 6 3 2 Check for Damage 6 4 INSTALLATION 7 4 1 Safety Precautions 7 4 2 Shelf Preparation Mounting 7 4 3 Rectifier Module Insertion Removal 7 5 WIRING AND CONNECTIONS 8 5 1 Safety Precautions 8...

Страница 7: ...eplacement 16 8 3 MOV Replacement 17 9 WARRANTY 18 10 ABBREVIATIONS AND ACRONYMS 19 FIGURES Figure 1 Cordex 125 4 4kW rectifier front panel 2 Figure 2 CAN serial ports and termination selection 10 Fig...

Страница 8: ...ization remote access dial out on alarm battery diagnostics as well as Web server and Simple Network Management Protocol SNMP support for configuration and monitoring Details of controller operation a...

Страница 9: ...will flash when communication is lost The LED turns off when the rectifier is off e g when commanded via the CXC 2 1 1 3 ALARM The bottom LED red is on continuously in the event of an active Module Fa...

Страница 10: ...Located on the rear panel of the rectifier is a single connector for shelf power and communications 2 3 True Module Fail Alarm The power modules have a true fail alarm This provides a true indication...

Страница 11: ...a soft start feature is employed Soft Start sometimes referred to as current walk in works by gradually up to five seconds ramping the current limit up from zero to the actual or defined customer sett...

Страница 12: ...s will restart automatically however if more than three over voltage conditions occur in one minute the module will latch off and remain shut down until it is reset via the CXC 2 13 Battery Eliminator...

Страница 13: ...re the product is packed with at least three inches of shock absorbing material to prevent shipping damage 3 2 Check for Damage Prior to unpacking the product note any damage to the shipping container...

Страница 14: ...g in a 19 or 23 rack The configuration depends on the options chosen See drawing 030 769 06 NOTE The shelf shall be mounted in a clean and dry environment Allow at least 1 75 of free space in front of...

Страница 15: ...system and to prevent drifting floating analog especially current readings 5 4 AC Feeder Protection Sizing To maximize system reliability each power module should be fed from a dedicated protection fe...

Страница 16: ...or bus bars disconnected at battery and verify output polarity using a voltmeter Make battery connections only after all other wiring is completed DC output wire shall be UL approved XHHW or RHH RHW f...

Страница 17: ...s terminated See Figure 2 5 8 1 CAN Termination A jumper or switch depending on your configuration allows setting of the CAN OUT to be open to the next shelf in the system or terminated Termination mu...

Страница 18: ...e next state When in this state the CXC continues to monitor its inputs After the Start Delay state the rectifier will transition to the Soft Start state NOTE Soft start or current walk in gradually i...

Страница 19: ...the standard adjustment ranges Table A Output voltage modes 6 2 2 Output Current Power Modes These modes directly affect the output current and power The following table lists the four Output Current...

Страница 20: ...V Current Limit CL 9 100 100 Power Limit PL 0 100 100 Module Start Delay 0 250s 1s System Start Delay 0 600s 0s Low Voltage Alarm LVA 90 160V 106 3V High Voltage Alarm HVA 90 160V 134 1V EQ Timeout 1...

Страница 21: ...ols 7 3 Check Battery Polarity and Connect Verify correct battery polarity using a voltmeter ensuring no cells or batteries are reversed Connect battery as required to the output of the system or turn...

Страница 22: ...unded wrist strap when handling or installing circuit cards Procedure Date Completed Clean ventilation openings Inspect all system connections re torque as necessary Verify alarm control settings Veri...

Страница 23: ...pacitors to discharge 3 Remove the four screws two each side that secure the front panel to the module chassis 4 Slide the front panel out 5 Disconnect the fan power lead wires one set per fan and fro...

Страница 24: ...shelf 2 Slide the module 10 cm 4 out of the shelf and wait two minutes for module capacitors to discharge 3 Turn the module around to face the back of the unit and remove the one screw module bottom...

Страница 25: ...pon equipment failure during or after the warranty period No other obligations are expressed or implied Warranty also does not cover damage or equipment failure due to cause s external to the unit inc...

Страница 26: ...magnetic Compatibility and Radio Spectrum Matters ESD Electrostatic Discharge FCC Federal Communications Commission for the USA HVSD High voltage shutdown IEC International Electrotechnical Commission...

Страница 27: ...ram The testing and certifications are based on product safety standards developed by US based standards developing organizations and are often issued by the American National Standards Institute ANSI...

Страница 28: ...lf EMI The unit meets requirements of EN55022 see Standards for more EMC In accordance with FCC requirements we provide the following statement as specified in the FCC guidelines for conformance to Pa...

Страница 29: ...rt up Delay Programmable up to 120 seconds to enable stagger start of multiple rectifiers and to minimize the effect on a supply source Soft Start User adjustable to at least 5 seconds not including s...

Страница 30: ...23 mid mount brackets Connections Input Box type terminal block 6 to 16mm 2 10 to 6AWG Output Bus adapters with 3 8 studs on 1 centers Chassis Ground Compression lug 6 to 16mm 2 10 to 6AWG CAN Communi...

Страница 31: ...6 Conducted Electromagnetic Immunity EN 61000 4 11 Voltage Dips Short Interruptions and Variations ETS 300 019 1 1 Environmental Conditions Storage ETS 300 019 1 2 Environmental Conditions Transportat...

Страница 32: ...2006 05 2006 05 D2 c 2006 ARGUS TECHNOLOGIES O B DIMENSIONS ARE IN INCHES WITH METRIC mm IN BRACKETS INCHES mm G S 2006 05 G S 2006 05 N T S REV BY B ADDED MOUNTING BRACKETS S D W 010 589 20 4 4kW CO...

Страница 33: ...WITH METRIC mm IN BRACKETS INCHES mm N T S c 2006 ARGUS TECHNOLOGIES 0 5 03 127 7 TOP VIEW LIST 23 23 MID MOUNT 19 0 483 19 4 493 17 40 441 9 18 31 465 1 0 0 65 16 6 1 49 37 7 3 24 82 2 3 74 94 9 5 4...

Страница 34: ...H J U 2006 05 2006 05 D2 c 2006 ARGUS TECHNOLOGIES O B G S 2006 05 N T S REV BY B ADDED MOUNTING BRACKETS S D W L1 L2 L1 L2 L1 L2 GND 1 CAN H 2 NOT CONNECTED 3 CAN L 4 NOT CONNECTED 5 NOT CONNECTED 6...

Страница 35: ...ATION POSITIVE OUTPUT TERMINAL NEGATIVE OUTPUT TERMINAL 3 8 FLAT WASHER 3 8 LOCK WASHER 3 8 20 NUT 3 8 FLAT WASHER 3 8 20 x 1 HEX BOLT NEGATIVE BUS BAR CUSTOMER SUPPLIED POSITIVE BUS BAR CUSTOMER SUPP...

Страница 36: ...P 64 9 835 0700 F 64 9 837 3446E info innovative co nz W www innovative co nz Innovative Energies Ltd1 Heremai Street Auckland New Zealand 0612...

Отзывы: