SERVICE MANUAL
Installation and Maintenance
Steps
Procedure
top cover
Remove the screws connecting the top cover with
outer case, right side plate and left side plate; lift the
top cover upwards to remove it.
1. Remove the handle
2. Remove top cover
3.Remove front side plate
front side plate
Remove the screws connecting the front side plate
with chassis and middle isolation sheet,and then
remove the front side plate
Note:Take
VOM0833H7RE604
handle
Remove the screws connicting the handle with right
side plate and then remove the handle.
11. Removal Procedure
Warning: Be sure to wait for a minimum of 20 minutes after turning off all
power supplies and discharge the refrigerant completely before removal.
53