background image

 

 

INSTALLATION, USE AND MAINTENANCE MANUAL

 

 

 

 

 

HIGH-EFFICIENCY HEAT RECOVERY UNIT 

HRP DOMO EXT 

 

 

Содержание HRP DOMO EXT

Страница 1: ...INSTALLATION USE AND MAINTENANCE MANUAL HIGH EFFICIENCY HEAT RECOVERY UNIT HRP DOMO EXT...

Страница 2: ...STALLATION 9 2 1 CONDITIONS OF INSTALLATION 9 2 2 POSITIONING THE UNIT 9 2 3 CONDENSATE DRAIN CONNECTION 12 3 AIR DUCT CONNECTIONS 13 3 1 AIR DUCT GUIDELINES 13 4 ELECTRICAL CONNECTIONS 14 4 1 GENERAL...

Страница 3: ...6 1 CLEANING AND FILTER REPLACEMENT 23 6 2 GENERAL CLEANING OF THE UNIT AND CLEANING OF THE HEAT EXCHANGER AND FRAMEWORK 23 7 ALARMS 24 7 1 GENERAL INFORMATION 24 7 2 TROUBLESHOOTING WITH NO DISPLAY E...

Страница 4: ...urer s Sales Office to receive further information or updates regarding technical documentation and for any suggestions to improve this manual All communication received will be thoroughly examined 1...

Страница 5: ...s countries If installation is not carried out it may become a potential hazard Avoid installing the unit in very humid rooms or with large heat sources To prevent risk of electric shock on the electr...

Страница 6: ...unity rules Low Voltage Directive 2014 35 EC Electromagnetic Compatibility Directive 2014 30 EC Ecodesign 2009 125 EC 1 6 RANGE 1 HRP DOMO EXT 20 1 Defines the maximum flow rate Models 20 and 25 X Ent...

Страница 7: ...res and operation down to 25 C Very high exchange efficiency FANS Brushless fans with an electronic motor and control module A very high efficiency and low noise levels FILTERS ePM1 Filters 80 with lo...

Страница 8: ...ection doors If no ducts are installed on one of the 4 aeraulic intakes ensure that a suitable protective mesh is installed Check the power supply and earthing of the unit 1 10 DISMANTLING AND DISPOSA...

Страница 9: ...ed must be suitable to bear the weight of the unit and not cause vibration The following must be present where the unit is installed air duct connections 230V single phase electrical connection connec...

Страница 10: ...eed to the next step Exhaust partition disassembly for unit assembly Position the unit on the upper bracket moving the unit upwards and matching the two lower sleeves with the tubes supplied in the fr...

Страница 11: ...e with partition on the exhaust side using the 4 screws supplied Exhaust partition assembly for fresh air intakes directly on framework If fresh air and exhaust tubes outside the framework have been p...

Страница 12: ...densate drain must always be fitted with a siphon by the installer The installation tube must have been prepared when the framework was installed and brought inside the framework Provide the connectio...

Страница 13: ...on diameters Size 20 25 mm 160 160 We recommend a tube installation of at least 200mm to prevent vibration entrainment and unpleasant noise as a result of the installation The four aeraulic connection...

Страница 14: ...e relevant data are indicated in the annexed wiring diagram and on the unit identification plate The insertion of electric cables into the unit is prohibited unless specified in this documentation Use...

Страница 15: ...ECTIONS TO BE MADE BY THE CUSTOMER GRID Humidistat Air quality regulator Contact closed function enabled CHILLER Chiller Generator activation Potential free Contact Hot cold activation request N CL CP...

Страница 16: ...control for the management of all the functions of the unit and is fitted for wall or external box 502 installation Use shielded braided 0 75 1 mm cable with 4 conductors for the connection Remote pa...

Страница 17: ...The network is an RS485 network Use 2 core shielded cable with maximum length of 150m Thread so as to minimise branch lengths terminate the line with the supplied 120 resistor do not use star connecti...

Страница 18: ...in the wiring diagram N B Include a 230V relay between the output of the regulator and the unit input Air Quality Regulator Connection CONNECTION OF CIRCUIT BOARD FOR UMR HUMIDITY REGULATOR A room hu...

Страница 19: ...ovided on the board N COMMON CL FIXED VOLTAGE FOR 3 POINT VALVE CONTROL CP ON OFF 2 3 POINT VALVE CONTROL Water Battery Valve Connection GENERATOR BATTERY CONNECTION The unit includes control of a gen...

Страница 20: ...settings may only be carried out by qualified personnel authorised installer 5 2 I VERSION OPERATION The unit is fully controlled manually by the user via the EDA649 EDB649 EWG649 EWW649 wall mounted...

Страница 21: ...EED OPERATION Pressing the auto button will operate the unit at the nominal speed while keeping the sensor input control active The humidity regulator or air quality regulator will increase the speed...

Страница 22: ...ay All actions are disabled to the user and whenever any button is pressed LOC will appear To unlock the buttons repeat the sequence LOC Button lock 5 8 PANEL BRIGHTNESS ADJUSTMENT With the display of...

Страница 23: ...nstaller To clean the heat exchanger proceed as follows switch off the power to the unit open the framework cover by removing the screws remove the heat exchanger using the green fastener strap clean...

Страница 24: ...ans thermal protection tripped Check the power supply to fan Check the fan speed regulation device Check that the fan has not overheated and thermal protection tripped Insufficient air flow or availab...

Страница 25: ...feedback signal absent Check the connection of the board connector to the fan E3 H4 exhaust Probe Alarm Probe breakage and read failure Check probe connection or replace E5 H4 fresh air Probe Alarm P...

Страница 26: ...Innova S r l Page 26 HRP DOMO EXT Manual 8 NOTES AND MAINTENANCE INFORMATION NOTES...

Страница 27: ...Innova S r l Page 27 HRP DOMO EXT Manual...

Страница 28: ...Innova S r l Page 28 HRP DOMO EXT Manual 02 2020 rev 1 Technical Support Centre The data contained in this manual may be changed by the manufacturer without prior notice...

Отзывы: