
17
EN
EAP-QUAD-11 / Version 181008 / www.innotech.at
15
COPY TEMPLATE
ACCEPTANCE REPORT
ORDER NUMBER:
PROJECT:
CLIENT:
Specialist:
Company address:
CONTRACTOR:
Specialist:
Company address:
INSTALLATION:
(
please tick as appropriate!)
EAP
(single anchorage points)
ANCHORAGE POINTS
of a horizontal lifeline system in accordance
with EN 795:2012 TYPE C
Specialist:
Company address:
OPTIONAL: For set up of a horizontal lifeline system in accordance
with EN 795:2012 TYPE C
Installation of the anchorage points by:
Installation of the lifeline system by: _____
ACCEPTANCE REPORT NR.
____
(PART 1/2)
E A P - Q U A D R A T - 1 1