Figure 6
Figure 6
Figure 8
Figure 8
Figure 7
Figure 7
Figure 9
Figure 9
Figure 4
Figure 4
F
F
i
i
g
g
u
u
r
r
e
e
3
3
Figure 2
Figure 2
Figure 5
Figure 5
Figure 10
Figure 10
Remove the PCV pipe
Remove the PCV pipe
from the vacuum hose
from the vacuum hose
and coolant line.
and coolant line.
Use the 1/4” coupler to
Use the 1/4” coupler to
reconnect the coolant
reconnect the coolant
lines together.
lines together.
This is what the stock
This is what the stock
location of the ground
location of the ground
lines look like.
lines look like.
This ground lines is
This ground lines is
relocated to this pre-
relocated to this pre-
tapped hole.
tapped hole.
Insert the primary
Insert the primary
intake into the step
intake into the step
hose on the throttle
hose on the throttle
body. Use the clamp to
body. Use the clamp to
semi-tighten the intake
semi-tighten the intake
in place.
in place.
The bracket on the intake
The bracket on the intake
is lined up to the vibra-
is lined up to the vibra-
mount stud use the m6
mount stud use the m6
nut and fender washer to
nut and fender washer to
secure the intake.
secure the intake.
The bracket on the intake is lined
The bracket on the intake is lined
up to the vibra-mount stud. Use
up to the vibra-mount stud. Use
the m6 nut and fender washer to
the m6 nut and fender washer to
secure the entire intake.
secure the entire intake.
The 3.50” filter is pressed
The 3.50” filter is pressed
over the swaged end of
over the swaged end of
the intake. The clamp on
the intake. The clamp on
the filter is secured tight.
the filter is secured tight.
Bracket >>>>>
Bracket >>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>>
Press the step hose over
Press the step hose over
the throttle body and
the throttle body and
use two clamps.
use two clamps.
PCV pipe >>>
PCV pipe >>>
The smaller line
The smaller line
connects the
connects the
coolant lines.
coolant lines.
Breather hose connects
Breather hose connects
to the valve cover port.
to the valve cover port.
>>>>>>
>>>>>>
>>>>>>
>>>>>>
1/4” coupler >>>
1/4” coupler >>>
Use the stock
Use the stock
clamps to re-
clamps to re-
connect the lines
connect the lines
>>>>>>
>>>>>>
This is the location of
This is the location of
the new vibra-mount
the new vibra-mount
in this kit.
in this kit.
>>>>>>
>>>>>>