![Ingeteam INGEREV FUSION Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/ingeteam/ingerev-fusion/ingerev-fusion_start-up_2060700012.webp)
2.5 Smart charging configuration
2.5.1 Plant current configuration
In case the maximum current of an installation does not allow to charge in every charger at full power, the
smart charging of the plant shall be launched. To configure the maximum plant current access Applications >
Smart Charging > Plant
After configuring the plant current click on Save & Apply.
To apply the new configuration the charging must be reset by clicking on System > Reboot.