12
INGEREV GARAGE Wall
Ingeteam
The communications card switch (B in the following figure) must have position 3 On.
B
3. Connect the rest of the charging stations according to the following figures:
First station
Intermediate station
Final station
The jumper of the control card must be removed in all the stations except for the final station on the
communication ring, where it must be installed.
ABA2017IQM01_B - Installation and Operation Manual
Содержание Ingerev City
Страница 3: ...3 Ingeteam ABA2017IQM01_B English EN Espa ol ES Fran ais FR Italiano IT...
Страница 93: ...Notes Notas Remarques Note...
Страница 94: ...Notes Notas Remarques Note...
Страница 96: ...www gewiss com ABA2017IQM01_B 01 2018...