background image

 

INGECON SUN STORAGE 1Play

 

Technical Guide 

30/09/2019 

7/9

 

5  Setting the inverter 

This chapter describes how to configure the inverter settings when the ISS 1Play has been wired to the 
Pylontech battery. 

To do so, once all the previous steps have been completed, the following steps must be followed: 

5.1  DC Battery type 

Please be careful to choose the right battery type when you set up the configuration in 
your inverter. The battery or inverter manufacturers have no responsibility on the 
damages caused due to incorrect configurations. For instance, if you select “Lead-acid” 
as a battery type in the inverter configuration and the battery being used is “Lithium-ion”, 
the battery might get damaged or experience performance degradation. 

 

It is required to set the DC Battery type: 

Pylontech Force H1/H2 or Powercube X1/X2 

This can be done using the “Ingecon Sun Manager” software package (downloadable on 

www.ingeteam.com

or through the display: 

Using Ingecon Sun Manager: 

Settings 

 1-.DC BATTERY TYPE: Type of Battery > Lithium: Pylontech Force H1/H2 

 

or 

Settings 

 1-.DC BATTERY TYPE: Type of Battery > Lithium: Pylontech Powercube X1/X2 

 

Figure 1: DC Battery selection on Ingecon Sun Manager. 

Click on the “Send” button.  A screen informing that the configuration was successfully saved must appear 
when the settings are correctly applied to the inverter. 

Using the Display: 

To perform any configuration change through the display, the required installer password must be entered on: 

MAIN MENU > CONFIGURATION > ENTER PASSWORD 

The password is indicated on the “Installation and Operation Manual”, on the chapter dedicated to 
configuration. 

When the permission is given, go to: 

MAIN MENU > CONFIGURATION > BATTERY > LITHIUM > PYLONTECH HV > FORCE H1/H2  

or 

MAIN MENU > CONFIGURATION > BATTERY > LITHIUM > PYLONTECH HV > POWERCUBE X1/X2 

Confirm the desired selection by pressing the “OK” button.  A message to confirm the modification will pop up. 
A final screen that shows that the process has been completed will be shown on the display. 

 

Francisco Javier F.J.A. Ancn Jimenez

2019.10.31 08:36:45

Firmante: 

CN=Francisco Javier F.J.A. Ancn [email protected]=com0.9.2342.19200300.100.1.25=ingeteamrenovables

Llave publica: 

RSA/2048 bits

Содержание INGECON SUN STORAGE 1Play 3TL

Страница 1: ...working with PYLONTECH FORCE H1 H2 and POWERCUBE X1 X2 ABH2010IMC13_ Francisco Javier F J A Ancn Jimenez 2019 10 31 08 36 45 Firmante CN Francisco Javier F J A Ancn JimenezE francisco ancin ingeteam c...

Страница 2: ...Black start function 5 4 Battery s firmware update 6 5 Setting the inverter 7 5 1 DC Battery type 7 6 Final check 8 7 Attachment I References 9 Francisco Javier F J A Ancn Jimenez 2019 10 31 08 36 45...

Страница 3: ...he inverter FW versions can be found at the display or via the Ingecon Sun Manager software Using Ingecon Sun Manager The firmware version is indicated underneath the inverter serial number Using the...

Страница 4: ...cation wire to the ISS 1Play The ISS 1Play will send the necessary keep a live command to the Pylontech battery which is needed to keep its internal circuit breaker close When the battery does not rec...

Страница 5: ...3 After 30 seconds press and hold the red start button again for another 5 seconds 4 Then the inverter and battery should get powered Make sure that the display s screen is ON In this situation if the...

Страница 6: ...ributor For further details check the Pylontech guideline supplied by the distributor A minimum firmware version is necessary to work with the Ingecon Sun Storage 1Play Force H1 H2 V1 3 Powercube X1 X...

Страница 7: ...Lithium Pylontech Force H1 H2 or Settings 1 DC BATTERY TYPE Type of Battery Lithium Pylontech Powercube X1 X2 Figure 1 DC Battery selection on Ingecon Sun Manager Click on the Send button A screen inf...

Страница 8: ...an be done using the Ingecon Sun Manager software package or through the display Using the Display MAIN MENU MONITORING BATTERY MONIT STATUS doesn t show BMS ERROR Using Ingecon Sun Manager OnLine Bat...

Страница 9: ...un Manager Software Installation Manual of PYLONTECH Force series or Powercube series Ingecon Sun Training https www ingeconsuntraining info page_id 7049 Francisco Javier F J A Ancn Jimenez 2019 10 31...

Отзывы: