background image

PH30X-XXX-XXX-C (en) 

Page 7 of 8

PARTS LIST / PH30X-XXX-XXX-C AIR SECTION

 ASSEMBLY TORQUE REQUIREMENTS 

NOTE: DO NOT OVERTIGHTEN FASTENERS.

ALL FASTENERS ARE METRIC.

(105) Screw, 35 - 40 in. lbs (4.0 - 4.5 Nm).

(134) Screw, 35 - 40 in. lbs (4.0 - 4.5 Nm).

LUBRICATION / SEALANTS

  Apply Lubriplate FML-2 grease to all “O” rings, “U” cups 

and mating parts.

  Apply anti-seize compound to threads and bolt and 

nut flange heads which contact pump case when 

using stainless steel fasteners.

Figure 3

200 

138 

111

139 

137 

136

107

236

232 

233

232 

176 

 134

133

135

146

 105

107

166 

132 

243 

244 

199 

141 

140

167

121

 174

118

 173

169 

168 

170

171 

172 

121

173 

118

126

101

103

174 

127

201

MAJOR VALVE

PILOT VALVE

PART GROUP

Optional 94117

43

147

A replacement Major Valve Service Assembly is available separately, which includes the 

following:

637374-6: 105 (4), 107 (2), 111, 132, 135, 136, 137, 138, 139, 140, 141, 166, 176 (2), 199, 200, 232 

(2), 233, 236 (4), 243 and 244.

4.  Install (140) valve insert and (141) valve plate into (135) 

valve block. NOTE: Assemble (140) valve insert with 

“dished” side toward (141) valve plate. Assemble (141) 

valve plate with 2 identification dots toward (199 and 

200) gaskets.

5.  Assemble (244, 243 and 232) “O” rings, (199 and 200) gas-

kets and (233) adapter plate to (135) valve block.

6.  Assemble (132 and 166) gaskets, (176) checks and (232) “O” 

ring to (101) body.

7.  Assemble (135) valve block and components to (101) 

body, securing with (134) screws.

Muffler

Содержание ARO PH30 C Series

Страница 1: ...5 3 lit Maximum Particle Size 3 8 dia 9 5 mm MaximumTemperature Limits diaphragm ball seal material E P R EPDM 60 to 280 F 51 to 138 C Hytrel 20 to 180 F 29 to 82 C Nitrile 10 to 180 F 12 to 82 C Poly...

Страница 2: ...afety code requirements OPERATING AND SAFETY PRECAUTIONS READ UNDERSTAND AND FOLLOWTHIS INFORMATIONTO AVOID INJURY AND PROPERTY DAMAGE y y Obtain Material Safety Data Sheets on all materials from the...

Страница 3: ...TFE Joint Sealant to air cap item 68 only diaphragm bead groove Use ONLY 1 wrap of sealant DO NOT overlap seam Fill seam with heavy duty anearobic sealant Seam to be located between bolt positions 1 a...

Страница 4: ...30F BXX XXX C 1 94704 2 SS PH30F DXX XXX C 1 97417 SS PH30F FXX XXX C 1 96784 SS 68 Air Cap 1 96483 SS 69 Air Cap 1 94031 2 SS 70 Gasket 2 94100 B 77 Elbow 1 2 OD tube x 1 2 14 NPTF 1 2 59756 362 78 T...

Страница 5: ...o threads at assembly Apply Loctite 271 to threads Apply anti seize compound to threads and bolt and nut flange heads which contact pump case when using stainless steel fasteners Apply 1 4 wide x 1 8...

Страница 6: ...gs 3 Remove 136 end cap and 137 O ring releasing 111 spool MAJOR VALVE REASSEMBLY 1 Install new 138 and 139 U cups on 111 spool LIPS MUST FACE EACH OTHER 2 Insert 111 spool into 135 valve block 3 Inst...

Страница 7: ...68 170 171 172 121 173 118 126 101 103 174 127 201 MAJOR VALVE PILOT VALVE PART GROUP Optional 94117 43 147 A replacement Major Valve Service Assembly is available separately which includes the follow...

Страница 8: ...a non collapsing type capable of pulling a high volume y y Check all joints on the inlet manifolds and suction con nections These must be air tight y y Inspect the pump for solid objects lodged in th...

Отзывы: