The SoftStop
®
System posts may b e inserted into the soil u sing an au ger or post pou nding eq u ipment
u sed for the placement of gu ardrail posts. If an au ger is u sed, ensu re diameter is large enou gh to allow
for proper compaction of state/ specifying agency approv ed fill material. All SoftStop
®
System posts are
to b e assemb led plu mb . Proper compaction mu st b e accomplished for all posts in accordance w ith
state/ specifying agency gu idelines.
If rock is encou ntered at post locations 2- 8, refer to the local specifying agency gu idelines and the
AASHTO Roadside Design Gu ide for req u irements for emb edment depth into the rock and siz e of the
hole. If rock is encou ntered at post locations 0- 1, au ger a hole in the rock large enou gh for fu ll post
emb edment and proper compaction of approv ed fill material.
If rigid pav ement ( e.g. concrete or asphalt) of any thickness is encou ntered at post locations 0- 8, ensu re
a proper “ leav e- ou t” area ( the specified siz e of open space as defined in the AASHTO Roadside Design
Gu ide) is prov ided arou nd the posts and filled w ith state/ specifying agency approv ed b ackfill material.
* Grou t fill material mu st hav e a 28- day compressiv e strength of 120 psi ( 0.85 MPa) or less.
D rawing S ource: AAS H T O R oadside D esign G uide, 4
th
E dition 2011
Steel Post Detail
Section A- A
www.ingalcivil.com.au
Figure 7: Steel Post Detail
Created May 2016
Allrights in copyright reserved
www.ingalcivil.co.nz
18
The SoftStop
®
System posts may b e inserted into the soil u sing an au ger or post pou nding eq u ipment
u sed for the placement of gu ardrail posts. If an au ger is u sed, ensu re diameter is large enou gh to allow
for proper compaction of state/ specifying agency approv ed fill material. All SoftStop
®
System posts are
to b e assemb led plu mb . Proper compaction mu st b e accomplished for all posts in accordance w ith
state/ specifying agency gu idelines.
If rock is encou ntered at post locations 2- 8, refer to the local specifying agency gu idelines and the
AASHTO Roadside Design Gu ide for req u irements for emb edment depth into the rock and siz e of the
hole. If rock is encou ntered at post locations 0- 1, au ger a hole in the rock large enou gh for fu ll post
emb edment and proper compaction of approv ed fill material.
If rigid pav ement ( e.g. concrete or asphalt) of any thickness is encou ntered at post locations 0- 8, ensu re
a proper “ leav e- ou t” area ( the specified siz e of open space as defined in the AASHTO Roadside Design
Gu ide) is prov ided arou nd the posts and filled w ith state/ specifying agency approv ed b ackfill material.
* Grou t fill material mu st hav e a 28- day compressiv e strength of 120 psi ( 0.85 MPa) or less.
D rawing S ource: AAS H T O R oadside D esign G uide, 4
th
E dition 2011
Steel Post Detail
Section A- A
www.ingalcivil.com.au
Figure 8: Section A-A
Figure 9: ET-SS System (Test Level 3) – Post Placement Diagram
Notes:
1. Post 0-8 part of ET-SS System TL3
2. Post 9 is first post of longitudinal w-beam system (not included with ET-SS System)
3. Spacing between posts is on centre as shown
4. All ET-SS System posts must be installed plumb
5. Guardrail splice joint located at Post 9
Содержание ET-SS
Страница 1: ...www ingalcivil com au Release 07 19 ProductManual ET SS Tangent EndTerminal ...
Страница 33: ...33 Release 07 19 ...
Страница 34: ...34 Release 07 19 Notes ...
Страница 35: ...35 Release 07 19 Notes ...