Owner’s Manual |
Desktop Open Frame 2 Post Rack 10-3
2
Threaded Frame 2 Post Rack
6
NavePoint.com
3. EQUIPMENT INSTALLATION
1 Rack Unit
Tapped Hole Mounting:
Use the included 10-32 Mounting Screws
(J) to Secure your equipment to the Left
Vertical Rail (B) and Right Vertical Rail (C)