MB39C502-EVBSK-01 Evaluation Board Operation Manual, Doc. No. 002-08685 Rev. *B
10
4. Setup and Checkup
Supply the DC/DC input power of to the terminal between VIN to PGND.
Supply the PWM controller input voltage of 5.0V to VDD terminal.
Connect the VOUT terminal to required loading device or measuring instrument. In this time, connect the EN terminal
to “L” state.
Then, turning on the EN input. Confirming the DC/DC output voltage is setting voltage.
Note:
The recommended operating conditions of MB39C502 EN pin is 5.5V maximum. Please don’t connect EN to VIN when
VIN voltage is over 5.5V.
Figure 4-1 Image of Connection