30
First Operation Check
iina
74
e 0
3
.f
m
te
chn
ica
l ha
nd
boo
k
(1
40
8)
The start up procedure takes about 4 minutes and the end is indicated by a beep.
The UL5000 is in Stand-by mode now.
4
Check if the inlet port
/2 is blanked off. If not, please mount a blind flange with
O-Ring on the inlet port.
5
Press the
/6. The inlet will be evacuated and the measured
leak rate will be displayed a moment later.
This is the measurement mode. If a test part was connected you would start spraying
Helium to identify leaks.
Fig. 3-1: Top view of the UL5000
Pos. Description
Pos. Description
1
2
1
2
Содержание UL5000
Страница 102: ...102 Declaration of Conformity iina74e SIX fm technical handbook 1408 Declaration of Conformity ...
Страница 103: ...Declaration of Conformity 103 iina74e SIX fm technical handbook 1408 ...
Страница 105: ...Declaration of Conformity 105 iina74e SIX fm technical handbook 1408 ...
Страница 108: ...3 iina74e1RL fm technical handbook 1408 ...