First Operation Check
37
iina
70
e 0
3
.f
m
te
chn
ica
l ha
nd
boo
k
(1
40
8)
3.2.2
Internal Calibration
9
Proceed the internal calibration (Please refer to Chapter
For better quantitative measurements please allow the unit to warm up (15 … 20
minutes).
•
(Soft Key no. 5
/8) to get into the calibration menu.
•
Select
internal
(Soft Key no. 4
/5) to choose the internal calibration.
•
Select
automatic
/11). The automatic procedure of the
internal calibration is started and takes about 30 seconds.
10
Press the
/13 until the message
STAND-BY / VENTED
appears
on the display. The inlet is vented now.
3.2.3
Verification
To verify the accuracy please proceed through the following steps. A test leak is
required. If a test leak is not available please continue with #16.
11
Remove the blind flange from the inlet port and connect the open helium test leak to
the inlet port.
12
Press the
/6 again. The inlet will be evacuated and the leak
rate of the test leak will be measured and displayed.
13
Press the
/13 to interrupt the measurement. The Stand-by
mode will be displayed.
14
Press the
/13 again until the message
STAND-BY vented
appears an the display. The inlet is vented now.
15
Remove the helium test leak from the inlet port and put a blind flange onto the inlet
port again.
16
Switch off the leakdetector by using the mains switch
/8.
The first operation is finished.