8 - 44
PN
07
4-
51
9-
P1
C
3000 Micro GC Operating Manual
Proceed as follows:
1
Connect the Carrier Gas Cylinder Recharge Kit (PN PNU-2058) to the supply
tank via the CGA-580 fitting. See
. To avoid leaks, tighten the
connections securely.
2
Make sure the needle valve of the Carrier Gas Cylinder Recharge Kit is fully
closed by turning the needle valve clockwise until it is firmly seated. See
Figure 8-44 Cylinder recharging kit setup
3
Partially open the valve on the supply tank. No gas should flow.
4
Loosely connect the 1/8 in. tube from the Carrier Gas Cylinder Recharge Kit to
the
CARRIER FILL
(Swagelok) port on the Portable 3000 Micro GC back
.
Figure 8-45 Back of Portable 3000 Micro GC
5
Partially open the needle valve on the Carrier Gas Cylinder Recharge Kit and
listen for gas leaking through the loose 1/8 in. fitting on the back panel. This
purges the Carrier Gas Cylinder Recharge Kit transfer lines so that no air enters
Portable 3000 Micro GC.
6
After the transfer lines have been sufficiently purged (about fifteen seconds),
tighten the 1/8 in. fitting on the back panel of Portable 3000 Micro GC.
To the 3000 Micro GC
1800 PSI (12,450 kPa)
Carrier fill port
Transfer line
with Swagelok
fittings
Supply tank
Overpressure vent
Supply tank
valve
Pressure gauge
CGA 580 fitting
Needle valve
Carrier fill
port
Carrier
jumper tube
Carrier in ports
Содержание 3000 Micro GC
Страница 1: ...O P E R A T I N G M A N U A L 3000 Micro GC Gas Analyzer PN 074 519 P1C Cover Page ...
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 18: ...TOC 10 PN 074 519 P1C 3000 Micro GC Operating Manual This page is intentionally blank ...
Страница 26: ...1 8 PN 074 519 P1C 3000 Micro GC Operating Manual This page is intentionally blank ...
Страница 128: ...6 20 PN 074 519 P1C 3000 Micro GC Operating Manual This page is intentionally blank ...
Страница 268: ...11 20 PN 074 519 P1C 3000 Micro GC Operating Manual This page is intentionally blank ...