8 - 31
PN
07
4-
51
9-
P1
C
3000 Micro GC Operating Manual
6
Use EZ IQ software to load the desired method.
7
Turn on the Heated Regulator.
8
Wait approximately five minutes for the Heated Regulator to stabilize at
operating temperatures.
9
If not already connected, connect the transfer line to the quick disconnect on
the Heated Regulator. See
.
Figure 8-34 Typical setup using a transfer line (2-channel instrument shown)
10
Start sample flow through the transfer line to 3000 Micro GC.
Heated transfer line (user provided)
Quick disconnect fitting
Low pressure vent tubing
Relief valve
High pressure vent tubing
Содержание 3000 Micro GC
Страница 1: ...O P E R A T I N G M A N U A L 3000 Micro GC Gas Analyzer PN 074 519 P1C Cover Page ...
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 18: ...TOC 10 PN 074 519 P1C 3000 Micro GC Operating Manual This page is intentionally blank ...
Страница 26: ...1 8 PN 074 519 P1C 3000 Micro GC Operating Manual This page is intentionally blank ...
Страница 128: ...6 20 PN 074 519 P1C 3000 Micro GC Operating Manual This page is intentionally blank ...
Страница 268: ...11 20 PN 074 519 P1C 3000 Micro GC Operating Manual This page is intentionally blank ...