12    -    Uninteruptable Power Supply ~ 275707

Test unit India

 Test unit India

§

Connect the UPS on the test box.

§

Push the start test button.

§

Load the UPS with test software.

§

Turn pot meter R18 till leds 1 and 2 switch on.

§

Turn pot meter R13 till leds 3 and 4 switch on.

§

Seal the setting with nail polish.

§

Press the print ticket button. (a ticket will be printed)

§

Load the UPS with the final software.

§

Push the stop button.

§

Remove the UPS and place the UPS together with the ticket in an anti static (transport) bag

Содержание 275707

Страница 1: ...2016 Inepro B V All rights reserved Operator Manual Uninteruptable Power Supply 275707 Uninteruptable Power Supply 275707 Product Version N A Version of this manual 1 1 0...

Страница 2: ...Version 1 1 0 Inepro B V http www inepro com Table of Contents Functional description of the UPS 2 Connections 4 Programming connector and LED 6 Cables 8 Adjusting the UPS 10 Test unit India 12...

Страница 3: ...Functional description of the UPS PartI...

Страница 4: ...Voltage of battery High signal Battery capacity sufficient Switching signal 1 Hz Battery almost empty replacement necessary No signal Battery empty The PayCon does not start up a transaction 2 Towards...

Страница 5: ...Connections PartII...

Страница 6: ...rol cable 2 wired cable Power cable to PayCon Black wire Power cable from net adaptor Connecting the PayCon Cable Function White brown PayCon power from UPS Red blue Power for UPS 5V Can be plugged in...

Страница 7: ...Programming connector and LED PartIII...

Страница 8: ...wer Supply 275707 Programming connector and LED Programming connector and LED Programming connector For loading a programme in the microcontroller LED Long signal power from net adaptor Short signal p...

Страница 9: ...Cables PartIV...

Страница 10: ...8 Uninteruptable Power Supply 275707 Cables Cables Power cable between UPS and PayCon Interface cable between UPS and PayCon...

Страница 11: ...Adjusting the UPS PartV...

Страница 12: ...ly the PayCon is connected Power the net adaptor in a wall socket Set the power supply Voltage on 13 7 Volt Turn the pot meter R18 till the led D11 right side UPS switches on Measure with the Fluke sc...

Страница 13: ...Test unit India PartVI...

Страница 14: ...test software Turn pot meter R18 till leds 1 and 2 switch on Turn pot meter R13 till leds 3 and 4 switch on Seal the setting with nail polish Press the print ticket button a ticket will be printed Lo...

Страница 15: ...Version 1 1 0 13...

Страница 16: ......