background image

A Quick Start Guide to Setting up the Solar Power Supply

 

for the Radius

® 

BZ1 and RGX

® 

Gateway

 

 

 

      STEP 1: SITE SELECTION

 

Before setting up the Solar Power Supply (SPS), carefully select the site. 

1.

 

Select an open, outdoor location with abundant sunshine. 

2.

 

Avoid obstacles (e.g. trees, buildings, etc.) that may block the sun and 
also areas subject to frequent flooding

.

 

 

STEP 2: INSTALL BATTERY IN ENCLOSURE 

IMPORTANT: 

Safety Team 

– Install battery* before moving SPS to deployment site! 

1.

 

From the box labeled 

“ALL OTHER EQUIPMENT”, 

remove the insert 

assembly (with the enclosure) and the battery. 

2.

 

On the back of the enclosure, make sure the power switch is OFF. 

3.

 

Open the enclosure. Remove the battery holder, place the battery inside, 
replace the battery holder, and secure using provided hardware. 

4.

 

Connect the red lead to the positive (+) terminal, the black lead to the 

negative (-) terminal of the battery, and secure. 

5.

 

Check the battery voltage to ensure that the battery is fully charged 

(about 12 volts DC). Shut enclosure door and secure. 

 *

Note:

 

Always install battery  in a nonhazardous or declassified location

 

STEP 3: DEPLOY TO SITE

 

1.

 

Gather insert assembly and other SPS components and transport to 
selected site. 

Note: 

Radius® BZ1 and RGX® Gateway are ordered and shipped separately. 

2.

 

Remove stand assembly (legs) from box labeled 

LEGS

, place in an 

upright position, and spread apart, slightly.  

3.

 

As needed, adjust the length of each leg using the adjustment pins.      

 

STEP 4: INSTALL INSERT ASSEMBLY IN STAND

 

1.

 

After placing the stand upright, locate the label on top that reads 

“FRONT”.

 

2.

 

On the orange insert assembly, locate the matching 

“FRONT”

 label. 

 

3.

 

With both labels facing you, align the pegs on the insert assembly with the 
pockets (tubes) on the legs and insert.

 

4.

 

Optional: Secure the orange insert by installing 2 cotter pins. For added stability, 
use the j-hook stakes to secure the legs and feet of the stand. 

 

STEP 5: INSTALL SOLAR PANEL

 

1.

 

From the box labeled 

“ALL OTHER EQUIPMENT”, 

remove the solar assembly 

(panel, mount, and cable with minilocks). 

2.

 

The solar assembly arrives ready for use, attached to the panel. Place the 

solar assembly on top of the connector on the stand. Attach the other end of 
the cable to the port 

marked “Solar Panel” on the back of the enclosure. 

3.

 

For  maximum  charging  efficiency,  orient  the  solar  panel  to  due  south 
(northern hemisphere) or due north (southern hemisphere). 

4.

 

 Secure the solar assembly by hand-tightening the two adjusting knobs. 

Then, snap the plastic minilocks onto both ends of the solar cable. 

 

 

  

 

 

 

 

 

 

 

 

www.indsci.com

 

Отзывы: