Contents
1
Introduction
5
1.1
General
5
1.2
Overview of Licenses
5
2
Delivery Scope
6
3
Connectors and Status Displays
7
3.1
Connectors
7
3.2
Status LEDs
7
4
Installation and Connection
8
4.1
Installation
8
4.2
Measuring Location
8
4.3
Connection to PROFIBUS DP
9
4.3.1
Active PROFIBUS Cable
9
4.3.2
At the Bus End
10
4.3.3
Loop-in
11
4.4
Power Supply
12
5
Commissioning
12
5.1
First Connection to the Network
12
5.1.1
Case 1 - Local Access Only
14
5.1.2
Case 2 - Network Integration
14
5.1.3
Other Basic Settings
14
5.1.3.1
Internal Date and Time
14
5.1.3.2
Measuring Location
14
5.1.3.3
Favorites/Bookmarks
14
5.1.3.4
Language
14
5.2
Measuring Procedure – First Steps
15
5.2.1
Startup and Segment Detection
15
5.2.2
Factory Preset Alarm Defaults
15
5.2.3
Error Indication
16
5.2.4
Evaluation, Threshold Adjustment and Troubleshooting
16
5.2.5
Troubleshooting
17
6
Quality Parameters
18
6.1
Drop-outs
18
6.2
Diagnostics
18
6.3
Error telegrams
19
6.4
Retries
19
6.5
Bus Cycle Time
19
7
Web Interface
20
7.1
Startup Page/Overview
20
7.1.1
Event Overview (Network Overview)
21
7.1.2
Device Overview
21
7.2
Alarm List
22
7.3
Snapshots
22
7.4
System Information
22
7.5
Settings
23
7.5.1
Tresholds/Alarms
23
7.5.2
Last Cycle
23
7.5.3
Device Designations
23
7.5.4
System
24
7.5.4.1
Network
24
7.5.4.2
SNMP/LLDP
24
7.5.4.3
Time/Date
24
7.5.4.4
Password
24
7.5.4.5
License
24
7.5.4.6
Firmware
24
7.5.4.7
Restart
24
8
Snapshot Analysis
25
9
Troubleshooting
27
10
Specifications
29
11
GPL Information
29
12
CE Note
30
13
Notices
31
Содержание PB-INspektor
Страница 2: ......
Страница 32: ...PB INspektor Notices Page 31 13 Notices...
Страница 33: ...PB INspektor Notices Page 32...
Страница 34: ...PB INspektor Notices Page 33...
Страница 35: ......