background image

1

Determine where the Aqua-grade linear will be installed.
(if the product is being installed into an existing floor the
screed will need to be excavated first.)

2

Measure out and mark the position of the waste pipe
and gully.

3

Using appropriate tools, excavate enough concrete 
to allow the waste to be fitted.

5

Take the yellow starter section and screw in the 
levelling feet. Then clip the feet mounting plates onto
levelling feet.

4

Install the gully and waste pipe in an approved manner.

6

Position the starter section correctly and mark the 
position of the mounting plates. Temporarily place the
drain channel into the starter section and connect the
waste to ensure correct positioning.

Section 4: General Installation guidance 

for all configuration types

This section covers parts of the installation that are are common to all configuration types.

Please see section 5 and follow the relevant stages that are applicable to the type you are installing. 

Page 5

Содержание Aqua-Grade Linear

Страница 1: ...assembly rules Section 4 General Installation guidance Section 5 Assembly methods If you require any further information about this product please contact our technical team on 01460 258 682 SAFETY Pl...

Страница 2: ...ate SCR SPACER Spacer for moulded foot SCR FOOT Moulded foot SCR IMP Insulation mounting plate Optional available separately Can be used with both types of foot Section 1 Components Page 2 Parts used...

Страница 3: ...gradient 2 Walls required 2 falls of gradient 3 Walls required 1 fall of gradient Section 2 Configuration types The Aqua grade Linear may be arranged in a wide range of sizes and configurations use th...

Страница 4: ...lue corner section must always have 2 feet fitted When using configurations that start from a wall it is important that 2 feet are fitted to the first section to support the section properly excludes...

Страница 5: ...clip the feet mounting plates onto levelling feet 4 Install the gully and waste pipe in an approved manner 6 Position the starter section correctly and mark the position of the mounting plates Tempora...

Страница 6: ...ated and levelled correctly this illustration shows a corner section but this is dependant on the configuration type 12 When making levelling adjustments it is important that the feet are only just in...

Страница 7: ...to prevent hollow areas 18 When fully filled it may be necessary to allow the screed to dry out slightly before final finish trowelling When complete the shuttering can be removed and the remaining fl...

Страница 8: ...or 4 falls no walls configuration 5 Please follow these steps as a general guide for this type of configuration alternative sizes are available Always work in a clockwise or right to left direction Af...

Страница 9: ...r 3 falls 1 wall configuration Please follow these steps as a general guide for this type of configuration alternative sizes are available Always work in a clockwise or right to left direction After e...

Страница 10: ...lls corner drain can be assembled as Left hand and Right hand version The assembly process for these is slightly different please see notes below and assembly guide for these types on page 11 Parts fo...

Страница 11: ...ls 2 walls configuration left and right hand Please follow these steps as a general guide for this type of configuration alternative sizes are available Always work in a clockwise or right to left dir...

Страница 12: ...ly order for 1 fall 3 walls configuration Please follow these steps as a general guide for this type of configuration Always work in a clockwise or right to left direction After each row is completed...

Отзывы: