STEP 8 (See Diagram 8 & Lat Bar Cable Loop Diagram)
A.) Follow the below instructions to use the Lat Bar.
B.) Attach a Tech Rod Cable (#11) to the Right Pulley on the Extension Tube (#43). Attach
the other end, L Shaped Connector (#41) to one of the Tech Rod.
C.) Attach one 57” Lat Cable (#35) to the right Pulley on the Upper Pulley Support Bar (#18).
Draw the Cable over the Pulley then downward to the right Pulley on the Extension Tube
(#43). Connect the Lat Cable to the End Hook (#31) on the right Tech Rod Cable (#11).
Repeat the same procedure to install the other Lat Cable.
D.) Connect the Lat Bar (#37) or two Hand Straps (#38) to the End Hooks (#31) on the two Lat
Cables.
E.) Connect the end of two 40” Leg Developer Cables (#36) to the Leg Developer (#30) using
an End Hook (#31). Draw the other end of the Cable underneath the Cable Roller to the
Cable Hanger (#42) on the side of the Vertical Frame. Repeat the same procedure to
install the other Leg Developer Cable. This is just a storage position for the Leg Developer
Cables.
F.) Use the L-shape Connector (#41) on the Tech Rod Cable to connect the selected Tech
Rods. Please refer to the Resistance Chart on page 18.
DIAGRAM 8
11
Содержание TECH ROD TR-2
Страница 5: ...HARDWARE PACK 3 ...
Страница 14: ...LAT BAR CABLE LOOP DIAGRAM 12 ...
Страница 16: ...LEG DEVELOPER CABLE LOOP DIAGRAM 14 ...
Страница 18: ...TECH ROD CABLE LOOP DIAGRAM 16 ...
Страница 19: ...EXPLODED DIAGRAM 17 ...