STEP 4 (See Diagram 4)
A.) Attach the Leg Developer (#5) to the open bracket on the Main Frame (#1). Secure it with
an Axle (#17), two M10 x ¾” Allen Bolts (#36), and two
∅
¾” Washers (#42).
B.) Insert one Foam Tube (#10) halfway through the hole on the Main Frame. Insert two
Foam Tubes halfway through the holes on the Leg Developer (#5). Push six Foam Rolls
(#24) onto the Tubes from both ends. Plug six Foam Roll End Caps (#25) into the Tubes.
C.) Slide the Olympic Sleeve (#20) onto the weight post on the Leg Developer. Attach a
Spring Clip (#22) to the Sleeve.
DIAGRAM 4
23
Содержание MARCY SM 4000
Страница 4: ...SMITH MACHINE HARDEWARE PACK 3...
Страница 5: ...SMITH MACHINE HARDEWARE PACK 4...
Страница 8: ...DIAGRAM2 7...
Страница 12: ...CABLE LOOP 11...
Страница 16: ...DIAGRAM 8 15...
Страница 18: ...EXPLODED DIAGRAM 17...
Страница 20: ...MULTIPURPOSE BENCH HARDWARE PACK 19...
Страница 26: ...25...